Logo de AXE Machinery
Logo de AXE Machinery
MACHINERY//DISTRIBUTEUR
ARJESIMPAKTOR
01Accueil
02MODÈLES

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// LOURD

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER LOURD

[ 01 ]1250 D//[ 02 ]1250 E//

// Archive machines

[ 00 ]Tous les modèles//[ 99 ]Bibliothèque PDF//
Actif
03SOLUTIONS
04TECH
05CONFORMITÉ
Étude d'Investissement
US-TX // CONFORMITÉ🇺🇸 ACTIVE

Texas (États-Unis)ARJES Impaktor 350 EVO II

▸ Mandat réglementaire

“Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).”

Acte original:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
Source : Registre des données réglementairesRévision requise
ARJES Impaktor 350 EVO II — recommended shredder for Texas (États-Unis)
Puissance
175 kW
Transmission
diesel
Émissions
Tier 4_Final
Prix catalogue
€170K
Taxe de mise en décharge
110EUR/t
Déchets C&D mixtes · 28 EUR/t fraction propre
Économies annuelles estimées
€3520K
€3,520,000 à 40,000 t/an, diversion 80%
OPEX annuel (TCO)
€66K
€66,269 · carburant + AdBlue + entretien · 2 000 h/an
Énergie / an
€40,800
AdBlue / an
€1,469
Maintenance / an
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculateur ROI // US-TX
40,000t/an
5,000 t80,000 t

Taxe de décharge : 110 EUR/t · Diversion : 80%

Économies annuelles estimées
€3,520,000
110 EUR/t × 40,000 t × 80% déviation
ARJES Impaktor 350 EVO II pour Texas (États-Unis)
Économies annuelles estimées€3,520,000
Base juridique

Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).

Acte original:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
BOUCLIER_FISCAL // INCITATIONS· ARJES Impaktor 350 EVO II
Mécanismes :accelerated depreciationcit deduction
✓ 100% AMORT. ACCÉLÉRÉ
Transmission :dieselÉmissions :Tier 4_FinalCarburant :24 L/h
← Retour au Hub de conformité
AXE MACHINERY
Distributeur officiel ARJES — Rapport de conformité
21 Sept 2026
Texas (États-Unis)
ACTIVE

1. Base réglementaire

Acte original: Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration Program
1. Base réglementaire: Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).
Acte réglementaire : TCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration

2. Analyse de l'impact économique

ParamètreValeur
RégionTexas (États-Unis)
Taxe de mise en décharge110 EUR/t
Débit annuel40,000 t/yr
Taux de diversion80%
Système recommandéARJES Impaktor 350 EVO II
Type de transmissionDIESEL
Norme d'émissionsTier 4_Final
Économies annuelles estimées (taxe de décharge)
€3,520,000
à 40,000 t/an, diversion 80%
Composante OPEXCoût annuel (EUR)
Diesel + AdBlue€40,800(incl. AdBlue €1,469)
Maintenance€24,000
Total OPEX annuel€66,269
AXE Machinery — Partenaire de distribution officiel ARJES GmbHarjes-impaktor.rs

// CENTRE D'INFORMATION

Recherche & IngénierieHub de conformitéACTUALITÉSLogistique & Heritage

Solutions industrielles par matériau // Hubs opérationnels

Concassage de bétonRecyclage du boisTraitement de la ferrailleDéchets ménagers solidesConstruction et démolitionRecyclage pneus OTRRecyclage VHUToutes les solutions →

// MATRICE DE COMPARAISON

INTERNE vs SOUS-TRAITANCEMOBILE vs STATIONNAIREDIESEL vs ÉLECTRIQUETEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Toutes les comparaisons →

// CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tour 1Bulevar Mihajla Pupina 611070 Belgrade, SerbieUTC+144.8125 N, 20.4612 E
Logo de AXE Machinery
ARJESIMPAKTOR
Mentions légalesPolitique de confidentialitéConditions d'utilisation
© 2026 AXE Machinery. Tous droits réservés