Logo de AXE Machinery
Logo de AXE Machinery
MACHINERY//DISTRIBUTEUR
ARJESIMPAKTOR
01Accueil
02MODÈLES

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// LOURD

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER LOURD

[ 01 ]1250 D//[ 02 ]1250 E//

// Archive machines

[ 00 ]Tous les modèles//[ 99 ]Bibliothèque PDF//
Actif
03SOLUTIONS
04TECH
05CONFORMITÉ
Étude d'Investissement
US-NY // CONFORMITÉ🇺🇸 ACTIVE

New York (États-Unis)IMPAKTOR 1100

▸ Mandat réglementaire

“New York's DEC Part 360 (Title 6 NYCRR Part 360) regulates solid waste management facilities, including specific permits for C&D processing facilities (Subpart 360-5) requiring source separation of recyclable C&D fractions. NYC Local Law 97 (Climate Mobilization Act, effective 2024) imposes building emissions limits that drive urban demolition and retrofit projects, mandating C&D waste diversion from landfill. Tier 4 Final emission standards apply to off-road diesel equipment under DEC coordination with EPA. Non-compliance penalties range from USD $1,000 to $50,000 per violation per day. New York gate fees for mixed C&D waste are the highest in the USA at approximately USD $210/ST in NYC metro.”

Acte original:New York State DEC Part 360 (Solid Waste Management Facilities) + NYC Local Law 97 (Climate Mobilization Act)NYC DEC Part 360 (Solid Waste Management Facilities) + Local Law 97 (Building Emissions)
Source : Registre des données réglementairesRévision requise
IMPAKTOR 1100 — recommended shredder for New York (États-Unis)
Puissance
585 kW
Transmission
diesel
Émissions
Tier 4_Final
Prix catalogue
€479K
Taxe de mise en décharge
192EUR/t
Déchets C&D mixtes · 48 EUR/t fraction propre
Économies annuelles estimées
€6144K
€6,144,000 à 40,000 t/an, diversion 80%
OPEX annuel (TCO)
€76K
€75,579 · carburant + AdBlue + entretien · 2 000 h/an
Énergie / an
€49,500
AdBlue / an
€2,079
Maintenance / an
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculateur ROI // US-NY
40,000t/an
5,000 t80,000 t

Taxe de décharge : 192 EUR/t · Diversion : 80%

Économies annuelles estimées
€6,144,000
192 EUR/t × 40,000 t × 80% déviation
IMPAKTOR 1100 pour New York (États-Unis)
Économies annuelles estimées€6,144,000
Base juridique

New York's DEC Part 360 (Title 6 NYCRR Part 360) regulates solid waste management facilities, including specific permits for C&D processing facilities (Subpart 360-5) requiring source separation of recyclable C&D fractions. NYC Local Law 97 (Climate Mobilization Act, effective 2024) imposes building emissions limits that drive urban demolition and retrofit projects, mandating C&D waste diversion from landfill. Tier 4 Final emission standards apply to off-road diesel equipment under DEC coordination with EPA. Non-compliance penalties range from USD $1,000 to $50,000 per violation per day. New York gate fees for mixed C&D waste are the highest in the USA at approximately USD $210/ST in NYC metro.

Acte original:New York State DEC Part 360 (Solid Waste Management Facilities) + NYC Local Law 97 (Climate Mobilization Act)NYC DEC Part 360 (Solid Waste Management Facilities) + Local Law 97 (Building Emissions)
BOUCLIER_FISCAL // INCITATIONS· IMPAKTOR 1100
Mécanismes :accelerated depreciationcit deduction
✓ EXONÉRÉ DE TVA✓ 100% AMORT. ACCÉLÉRÉ
Transmission :dieselÉmissions :Tier 4_FinalCarburant :22.5 L/h
← Retour au Hub de conformité
AXE MACHINERY
Distributeur officiel ARJES — Rapport de conformité
21 Sept 2026
New York (États-Unis)
ACTIVE

1. Base réglementaire

Acte original: New York State DEC Part 360 (Solid Waste Management Facilities) + NYC Local Law 97 (Climate Mobilization Act)
1. Base réglementaire: New York's DEC Part 360 (Title 6 NYCRR Part 360) regulates solid waste management facilities, including specific permits for C&D processing facilities (Subpart 360-5) requiring source separation of recyclable C&D fractions. NYC Local Law 97 (Climate Mobilization Act, effective 2024) imposes building emissions limits that drive urban demolition and retrofit projects, mandating C&D waste diversion from landfill. Tier 4 Final emission standards apply to off-road diesel equipment under DEC coordination with EPA. Non-compliance penalties range from USD $1,000 to $50,000 per violation per day. New York gate fees for mixed C&D waste are the highest in the USA at approximately USD $210/ST in NYC metro.
Acte réglementaire : NYC DEC Part 360 (Solid Waste Management Facilities) + Local Law 97 (Building Emissions)

2. Analyse de l'impact économique

ParamètreValeur
RégionNew York (États-Unis)
Taxe de mise en décharge192 EUR/t
Débit annuel40,000 t/yr
Taux de diversion80%
Système recommandéIMPAKTOR 1100
Type de transmissionDIESEL
Norme d'émissionsTier 4_Final
Économies annuelles estimées (taxe de décharge)
€6,144,000
à 40,000 t/an, diversion 80%
Composante OPEXCoût annuel (EUR)
Diesel + AdBlue€49,500(incl. AdBlue €2,079)
Maintenance€24,000
Total OPEX annuel€75,579
AXE Machinery — Partenaire de distribution officiel ARJES GmbHarjes-impaktor.rs

// CENTRE D'INFORMATION

Recherche & IngénierieHub de conformitéACTUALITÉSLogistique & Heritage

Solutions industrielles par matériau // Hubs opérationnels

Concassage de bétonRecyclage du boisTraitement de la ferrailleDéchets ménagers solidesConstruction et démolitionRecyclage pneus OTRRecyclage VHUToutes les solutions →

// MATRICE DE COMPARAISON

INTERNE vs SOUS-TRAITANCEMOBILE vs STATIONNAIREDIESEL vs ÉLECTRIQUETEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Toutes les comparaisons →

// CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tour 1Bulevar Mihajla Pupina 611070 Belgrade, SerbieUTC+144.8125 N, 20.4612 E
Logo de AXE Machinery
ARJESIMPAKTOR
Mentions légalesPolitique de confidentialitéConditions d'utilisation
© 2026 AXE Machinery. Tous droits réservés