Logo de AXE Machinery
Logo de AXE Machinery
MACHINERY//DISTRIBUTEUR
ARJESIMPAKTOR
01Accueil
02MODÈLES

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// LOURD

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER LOURD

[ 01 ]1250 D//[ 02 ]1250 E//

// Archive machines

[ 00 ]Tous les modèles//[ 99 ]Bibliothèque PDF//
Actif
03SOLUTIONS
04TECH
05CONFORMITÉ
Étude d'Investissement
CH // CONFORMITÉ🇨🇭 ACTIVE

SuisseARJES Impaktor 1100

▸ Mandat réglementaire

“Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.”

Acte original:Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
Source : Registre des données réglementairesRévision requise
ARJES Impaktor 1100 — recommended shredder for Suisse
Puissance
585 kW
Transmission
diesel
Émissions
Stage V
Prix catalogue
€479K
Taxe de mise en décharge
85EUR/t
Déchets C&D mixtes · 5 EUR/t fraction propre
Économies annuelles estimées
€2720K
€2,720,000 à 40,000 t/an, diversion 80%
OPEX annuel (TCO)
€114K
€113,510 · carburant + AdBlue + entretien · 2 000 h/an
Énergie / an
€86,400
AdBlue / an
€3,110
Maintenance / an
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculateur ROI // CH
40,000t/an
5,000 t80,000 t

Taxe de décharge : 85 EUR/t · Diversion : 80%

Économies annuelles estimées
€2,720,000
85 EUR/t × 40,000 t × 80% déviation
ARJES Impaktor 1100 pour Suisse
Économies annuelles estimées€2,720,000
Base juridique

Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.

Acte original:Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
BOUCLIER_FISCAL // INCITATIONS· ARJES Impaktor 1100
Mécanismes :vat exemptionaccelerated depreciationamortization shield
✓ EXONÉRÉ DE TVA✓ 40% AMORT. ACCÉLÉRÉ
Transmission :dieselÉmissions :Stage VCarburant :24 L/h
← Retour au Hub de conformité
AXE MACHINERY
Distributeur officiel ARJES — Rapport de conformité
21 Sept 2026
Suisse
ACTIVE

1. Base réglementaire

Acte original: Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
1. Base réglementaire: Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.
Acte réglementaire : Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)

2. Analyse de l'impact économique

ParamètreValeur
RégionSuisse
Taxe de mise en décharge85 EUR/t
Débit annuel40,000 t/yr
Taux de diversion80%
Système recommandéARJES Impaktor 1100
Type de transmissionDIESEL
Norme d'émissionsStage V
Économies annuelles estimées (taxe de décharge)
€2,720,000
à 40,000 t/an, diversion 80%
Composante OPEXCoût annuel (EUR)
Diesel + AdBlue€86,400(incl. AdBlue €3,110)
Maintenance€24,000
Total OPEX annuel€113,510
AXE Machinery — Partenaire de distribution officiel ARJES GmbHarjes-impaktor.rs

// CENTRE D'INFORMATION

Recherche & IngénierieHub de conformitéACTUALITÉSLogistique & Heritage

Solutions industrielles par matériau // Hubs opérationnels

Concassage de bétonRecyclage du boisTraitement de la ferrailleDéchets ménagers solidesConstruction et démolitionRecyclage pneus OTRRecyclage VHUToutes les solutions →

// MATRICE DE COMPARAISON

INTERNE vs SOUS-TRAITANCEMOBILE vs STATIONNAIREDIESEL vs ÉLECTRIQUETEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Toutes les comparaisons →

// CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tour 1Bulevar Mihajla Pupina 611070 Belgrade, SerbieUTC+144.8125 N, 20.4612 E
Logo de AXE Machinery
ARJESIMPAKTOR
Mentions légalesPolitique de confidentialitéConditions d'utilisation
© 2026 AXE Machinery. Tous droits réservés