Logo de AXE Machinery
Logo de AXE Machinery
MACHINERY//DISTRIBUTEUR
ARJESIMPAKTOR
01Accueil
02MODÈLES

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// LOURD

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER LOURD

[ 01 ]1250 D//[ 02 ]1250 E//

// Archive machines

[ 00 ]Tous les modèles//[ 99 ]Bibliothèque PDF//
Actif
03SOLUTIONS
04TECH
05CONFORMITÉ
Étude d'Investissement
QA // CONFORMITÉ🇶🇦 ACTIVE

QatarARJES Impaktor 1100

▸ Mandat réglementaire

“Qatar's Ministry of Municipality and Environment (MME) enforces strict waste disposal standards, requiring Construction Waste Management Plans (CWMPs) for all major projects. The country has accumulated approximately 40 million tonnes of construction waste. The C&D waste management market is valued at USD 1.1 billion (2025). The standard disposal rate reaches approximately 420 QAR/t (~€105/t) for mixed waste, with a lower rate of ~13 QAR/t (~€3/t) for inert materials. Dumping waste in unauthorized locations is a violation punishable by law. The National Development Strategy targets significant recycling improvements. The high gate fee makes on-site C&D processing extremely economical.”

Acte original:معايير إدارة النفايات بوزارة البلدية والبيئة وخطط إدارة نفايات البناء (CWMPs)Ministry of Municipality and Environment (MME) Waste Management Standards & Construction Waste Management Plans (CWMPs)
Source : Registre des données réglementairesRévision requise
ARJES Impaktor 1100 — recommended shredder for Qatar
Puissance
585 kW
Transmission
diesel
Émissions
Tier 3
Prix catalogue
€479K
Taxe de mise en décharge
105EUR/t
Déchets C&D mixtes · 3 EUR/t fraction propre
Économies annuelles estimées
€3360K
€3,360,000 à 40,000 t/an, diversion 80%
OPEX annuel (TCO)
€51K
€51,350 · carburant + AdBlue + entretien · 2 000 h/an
Énergie / an
€26,400
AdBlue / an
€950
Maintenance / an
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculateur ROI // QA
40,000t/an
5,000 t80,000 t

Taxe de décharge : 105 EUR/t · Diversion : 80%

Économies annuelles estimées
€3,360,000
105 EUR/t × 40,000 t × 80% déviation
ARJES Impaktor 1100 pour Qatar
Économies annuelles estimées€3,360,000
Base juridique

Qatar's Ministry of Municipality and Environment (MME) enforces strict waste disposal standards, requiring Construction Waste Management Plans (CWMPs) for all major projects. The country has accumulated approximately 40 million tonnes of construction waste. The C&D waste management market is valued at USD 1.1 billion (2025). The standard disposal rate reaches approximately 420 QAR/t (~€105/t) for mixed waste, with a lower rate of ~13 QAR/t (~€3/t) for inert materials. Dumping waste in unauthorized locations is a violation punishable by law. The National Development Strategy targets significant recycling improvements. The high gate fee makes on-site C&D processing extremely economical.

Acte original:معايير إدارة النفايات بوزارة البلدية والبيئة وخطط إدارة نفايات البناء (CWMPs)Ministry of Municipality and Environment (MME) Waste Management Standards & Construction Waste Management Plans (CWMPs)
BOUCLIER_FISCAL // INCITATIONS· ARJES Impaktor 1100
Mécanismes :vat exemptionaccelerated depreciation
✓ EXONÉRÉ DE TVA✓ 35% AMORT. ACCÉLÉRÉ
Transmission :dieselÉmissions :Tier 3Carburant :24 L/h
← Retour au Hub de conformité
AXE MACHINERY
Distributeur officiel ARJES — Rapport de conformité
21 Sept 2026
Qatar
ACTIVE

1. Base réglementaire

Acte original: معايير إدارة النفايات بوزارة البلدية والبيئة وخطط إدارة نفايات البناء (CWMPs)
1. Base réglementaire: Qatar's Ministry of Municipality and Environment (MME) enforces strict waste disposal standards, requiring Construction Waste Management Plans (CWMPs) for all major projects. The country has accumulated approximately 40 million tonnes of construction waste. The C&D waste management market is valued at USD 1.1 billion (2025). The standard disposal rate reaches approximately 420 QAR/t (~€105/t) for mixed waste, with a lower rate of ~13 QAR/t (~€3/t) for inert materials. Dumping waste in unauthorized locations is a violation punishable by law. The National Development Strategy targets significant recycling improvements. The high gate fee makes on-site C&D processing extremely economical.
Acte réglementaire : Ministry of Municipality and Environment (MME) Waste Management Standards & Construction Waste Management Plans (CWMPs)

2. Analyse de l'impact économique

ParamètreValeur
RégionQatar
Taxe de mise en décharge105 EUR/t
Débit annuel40,000 t/yr
Taux de diversion80%
Système recommandéARJES Impaktor 1100
Type de transmissionDIESEL
Norme d'émissionsTier 3
Économies annuelles estimées (taxe de décharge)
€3,360,000
à 40,000 t/an, diversion 80%
Composante OPEXCoût annuel (EUR)
Diesel + AdBlue€26,400(incl. AdBlue €950)
Maintenance€24,000
Total OPEX annuel€51,350
AXE Machinery — Partenaire de distribution officiel ARJES GmbHarjes-impaktor.rs

// CENTRE D'INFORMATION

Recherche & IngénierieHub de conformitéACTUALITÉSLogistique & Heritage

Solutions industrielles par matériau // Hubs opérationnels

Concassage de bétonRecyclage du boisTraitement de la ferrailleDéchets ménagers solidesConstruction et démolitionRecyclage pneus OTRRecyclage VHUToutes les solutions →

// MATRICE DE COMPARAISON

INTERNE vs SOUS-TRAITANCEMOBILE vs STATIONNAIREDIESEL vs ÉLECTRIQUETEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Toutes les comparaisons →

// CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tour 1Bulevar Mihajla Pupina 611070 Belgrade, SerbieUTC+144.8125 N, 20.4612 E
Logo de AXE Machinery
ARJESIMPAKTOR
Mentions légalesPolitique de confidentialitéConditions d'utilisation
© 2026 AXE Machinery. Tous droits réservés