Logo de AXE Machinery
Logo de AXE Machinery
MACHINERY//DISTRIBUTEUR
ARJESIMPAKTOR
01Accueil
02MODÈLES

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// LOURD

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER LOURD

[ 01 ]1250 D//[ 02 ]1250 E//

// Archive machines

[ 00 ]Tous les modèles//[ 99 ]Bibliothèque PDF//
Actif
03SOLUTIONS
04TECH
05CONFORMITÉ
Étude d'Investissement
NO // CONFORMITÉ🇳🇴 ACTIVE

NorvegeARJES Impaktor 1100

▸ Mandat réglementaire

“Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.”

Acte original:Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020
Source : Registre des données réglementairesRévision requise
ARJES Impaktor 1100 — recommended shredder for Norvege
Puissance
585 kW
Transmission
diesel
Émissions
Stage V
Prix catalogue
€479K
Taxe de mise en décharge
50EUR/t
Déchets C&D mixtes · 8 EUR/t fraction propre
Économies annuelles estimées
€1600K
€1,600,000 à 40,000 t/an, diversion 80%
OPEX annuel (TCO)
€116K
€115,997 · carburant + AdBlue + entretien · 2 000 h/an
Énergie / an
€88,800
AdBlue / an
€3,197
Maintenance / an
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculateur ROI // NO
40,000t/an
5,000 t80,000 t

Taxe de décharge : 50 EUR/t · Diversion : 80%

Économies annuelles estimées
€1,600,000
50 EUR/t × 40,000 t × 80% déviation
ARJES Impaktor 1100 pour Norvege
Économies annuelles estimées€1,600,000
Base juridique

Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.

Acte original:Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020
BOUCLIER_FISCAL // INCITATIONS· ARJES Impaktor 1100
Mécanismes :vat exemptionaccelerated depreciationamortization shield
✓ EXONÉRÉ DE TVA✓ 40% AMORT. ACCÉLÉRÉ
Transmission :dieselÉmissions :Stage VCarburant :24 L/h
← Retour au Hub de conformité
AXE MACHINERY
Distributeur officiel ARJES — Rapport de conformité
21 Sept 2026
Norvege
ACTIVE

1. Base réglementaire

Acte original: Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)
1. Base réglementaire: Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.
Acte réglementaire : Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020

2. Analyse de l'impact économique

ParamètreValeur
RégionNorvege
Taxe de mise en décharge50 EUR/t
Débit annuel40,000 t/yr
Taux de diversion80%
Système recommandéARJES Impaktor 1100
Type de transmissionDIESEL
Norme d'émissionsStage V
Économies annuelles estimées (taxe de décharge)
€1,600,000
à 40,000 t/an, diversion 80%
Composante OPEXCoût annuel (EUR)
Diesel + AdBlue€88,800(incl. AdBlue €3,197)
Maintenance€24,000
Total OPEX annuel€115,997
AXE Machinery — Partenaire de distribution officiel ARJES GmbHarjes-impaktor.rs

// CENTRE D'INFORMATION

Recherche & IngénierieHub de conformitéACTUALITÉSLogistique & Heritage

Solutions industrielles par matériau // Hubs opérationnels

Concassage de bétonRecyclage du boisTraitement de la ferrailleDéchets ménagers solidesConstruction et démolitionRecyclage pneus OTRRecyclage VHUToutes les solutions →

// MATRICE DE COMPARAISON

INTERNE vs SOUS-TRAITANCEMOBILE vs STATIONNAIREDIESEL vs ÉLECTRIQUETEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Toutes les comparaisons →

// CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tour 1Bulevar Mihajla Pupina 611070 Belgrade, SerbieUTC+144.8125 N, 20.4612 E
Logo de AXE Machinery
ARJESIMPAKTOR
Mentions légalesPolitique de confidentialitéConditions d'utilisation
© 2026 AXE Machinery. Tous droits réservés