Logo de AXE Machinery
Logo de AXE Machinery
MACHINERY//DISTRIBUTEUR
ARJESIMPAKTOR
01Accueil
02MODÈLES

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// LOURD

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER LOURD

[ 01 ]1250 D//[ 02 ]1250 E//

// Archive machines

[ 00 ]Tous les modèles//[ 99 ]Bibliothèque PDF//
Actif
03SOLUTIONS
04TECH
05CONFORMITÉ
Étude d'Investissement
BR // CONFORMITÉ🇧🇷 ACTIVE

BrésilIMPAKTOR 350 EVO II

▸ Mandat réglementaire

“Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.”

Acte original:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
Source : Registre des données réglementairesRévision requise
IMPAKTOR 350 EVO II — recommended shredder for Brésil
Puissance
175 kW
Transmission
diesel
Émissions
Tier 4_Final
Prix catalogue
€170K
Taxe de mise en décharge
55EUR/t
Déchets C&D mixtes · 15 EUR/t fraction propre
Économies annuelles estimées
€1760K
€1,760,000 à 40,000 t/an, diversion 80%
OPEX annuel (TCO)
€72K
€71,863 · carburant + AdBlue + entretien · 2 000 h/an
Énergie / an
€46,200
AdBlue / an
€1,663
Maintenance / an
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculateur ROI // BR
40,000t/an
5,000 t80,000 t

Taxe de décharge : 55 EUR/t · Diversion : 80%

Économies annuelles estimées
€1,760,000
55 EUR/t × 40,000 t × 80% déviation
IMPAKTOR 350 EVO II pour Brésil
Économies annuelles estimées€1,760,000
Base juridique

Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.

Acte original:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
BOUCLIER_FISCAL // INCITATIONS· IMPAKTOR 350 EVO II
Mécanismes :accelerated depreciationcit deduction
✓ 20% AMORT. ACCÉLÉRÉ
Transmission :dieselÉmissions :Tier 4_FinalCarburant :22 L/h
← Retour au Hub de conformité
AXE MACHINERY
Distributeur officiel ARJES — Rapport de conformité
21 Sept 2026
Brésil
ACTIVE

1. Base réglementaire

Acte original: Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002
1. Base réglementaire: Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.
Acte réglementaire : Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002

2. Analyse de l'impact économique

ParamètreValeur
RégionBrésil
Taxe de mise en décharge55 EUR/t
Débit annuel40,000 t/yr
Taux de diversion80%
Système recommandéIMPAKTOR 350 EVO II
Type de transmissionDIESEL
Norme d'émissionsTier 4_Final
Économies annuelles estimées (taxe de décharge)
€1,760,000
à 40,000 t/an, diversion 80%
Composante OPEXCoût annuel (EUR)
Diesel + AdBlue€46,200(incl. AdBlue €1,663)
Maintenance€24,000
Total OPEX annuel€71,863
AXE Machinery — Partenaire de distribution officiel ARJES GmbHarjes-impaktor.rs

// CENTRE D'INFORMATION

Recherche & IngénierieHub de conformitéACTUALITÉSLogistique & Heritage

Solutions industrielles par matériau // Hubs opérationnels

Concassage de bétonRecyclage du boisTraitement de la ferrailleDéchets ménagers solidesConstruction et démolitionRecyclage pneus OTRRecyclage VHUToutes les solutions →

// MATRICE DE COMPARAISON

INTERNE vs SOUS-TRAITANCEMOBILE vs STATIONNAIREDIESEL vs ÉLECTRIQUETEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Toutes les comparaisons →

// CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tour 1Bulevar Mihajla Pupina 611070 Belgrade, SerbieUTC+144.8125 N, 20.4612 E
Logo de AXE Machinery
ARJESIMPAKTOR
Mentions légalesPolitique de confidentialitéConditions d'utilisation
© 2026 AXE Machinery. Tous droits réservés