AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
UZ // COMPLIANCE🇺🇿 ACTIVE

UzbekistanARJES Impaktor 350 EVO II

▸ Regulatory Mandate

“Presidential Decree PP-328 introduces five-fold administrative fines for open burning of OTR tires and revocation of construction licenses for waste management violations. The growing mining sector demands OTR tire recycling infrastructure.”

Original Act:Указ Президента № PP-328Presidential Decree No. PP-328
Source: Regulatory data graphReview required
ARJES Impaktor 350 EVO II — recommended shredder for Uzbekistan
Power
175 kW
Drive
diesel
Emission
Tier 3
List Price
€170K
Landfill Gate Fee
10EUR/t
Mixed C&D waste · 2.5 EUR/t clean fraction
Est. Annual Savings
€320K
€320,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€68K
€67,512 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€42,000
AdBlue / yr
€1,512
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // UZ
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 10 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€320,000
10 EUR/t × 40,000 t × 80% diversion
ARJES Impaktor 350 EVO II for Uzbekistan
Est. Annual Savings€320,000
Legal Basis

Presidential Decree PP-328 introduces five-fold administrative fines for open burning of OTR tires and revocation of construction licenses for waste management violations. The growing mining sector demands OTR tire recycling infrastructure.

Original Act:Указ Президента № PP-328Presidential Decree No. PP-328
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 350 EVO II
Mechanisms:none
Drive:dieselEmission:Tier 3Fuel:21 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
07 Sept 2026
Uzbekistan
ACTIVE

1. Regulatory Basis

Original Act: Указ Президента № PP-328
1. Regulatory Basis: Presidential Decree PP-328 introduces five-fold administrative fines for open burning of OTR tires and revocation of construction licenses for waste management violations. The growing mining sector demands OTR tire recycling infrastructure.
Regulatory Act: Presidential Decree No. PP-328

2. Economic Impact Analysis

ParameterValue
RegionUzbekistan
Landfill Gate Fee10 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemARJES Impaktor 350 EVO II
Drive TypeDIESEL
Emission StandardTier 3
Estimated Annual Gate-Fee Savings
€320,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€42,000(incl. AdBlue €1,512)
Maintenance€24,000
Total Annual OPEX€67,512
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved