AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
US-TX // COMPLIANCE🇺🇸 ACTIVE

Texas (USA)ARJES Impaktor 350 EVO II

▸ Regulatory Mandate

“Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).”

Original Act:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
Source: Regulatory data graphReview required
ARJES Impaktor 350 EVO II — recommended shredder for Texas (USA)
Power
175 kW
Drive
diesel
Emission
Tier 4_Final
List Price
€170K
Landfill Gate Fee
110EUR/t
Mixed C&D waste · 28 EUR/t clean fraction
Est. Annual Savings
€3520K
€3,520,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€66K
€66,269 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€40,800
AdBlue / yr
€1,469
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // US-TX
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 110 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€3,520,000
110 EUR/t × 40,000 t × 80% diversion
ARJES Impaktor 350 EVO II for Texas (USA)
Est. Annual Savings€3,520,000
Legal Basis

Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).

Original Act:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 350 EVO II
Mechanisms:accelerated depreciationcit deduction
✓ 100% ACCEL. DEPRECIATION
Drive:dieselEmission:Tier 4_FinalFuel:24 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
19 Sept 2026
Texas (USA)
ACTIVE

1. Regulatory Basis

Original Act: Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration Program
1. Regulatory Basis: Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).
Regulatory Act: TCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration

2. Economic Impact Analysis

ParameterValue
RegionTexas (USA)
Landfill Gate Fee110 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemARJES Impaktor 350 EVO II
Drive TypeDIESEL
Emission StandardTier 4_Final
Estimated Annual Gate-Fee Savings
€3,520,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€40,800(incl. AdBlue €1,469)
Maintenance€24,000
Total Annual OPEX€66,269
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved