AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
US-FL // COMPLIANCE🇺🇸 ACTIVE

Florida (USA)ARJES Impaktor 350 EVO II

▸ Regulatory Mandate

“Florida's FDEP Chapter 62-701 (Florida Administrative Code) regulates solid waste management facilities, including specific provisions for C&D waste processing facilities (Section 62-701.730) and disaster debris management. Following major hurricane events (Ian 2022, Idalia 2023, Milton 2024), Florida activates emergency disaster debris management protocols that temporarily relax permitting for C&D processing but require full documentation of diverted tonnage. Tier 4 Final emission standards apply to off-road diesel equipment. Non-compliance penalties range from USD $1,000 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $140/ST, surging to USD $200/ST during active disaster recovery operations.”

Original Act:Florida Department of Environmental Protection (FDEP) Chapter 62-701 FAC — Solid Waste Resource Management Facilities + Disaster Debris Management RulesFDEP Chapter 62-701 (Solid Waste Facilities) + Disaster Debris Management Rules
Source: Regulatory data graphReview required
ARJES Impaktor 350 EVO II — recommended shredder for Florida (USA)
Power
175 kW
Drive
diesel
Emission
Tier 4_Final
List Price
€170K
Landfill Gate Fee
128EUR/t
Mixed C&D waste · 32 EUR/t clean fraction
Est. Annual Savings
€4096K
€4,096,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€71K
€71,242 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€45,600
AdBlue / yr
€1,642
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // US-FL
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 128 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€4,096,000
128 EUR/t × 40,000 t × 80% diversion
ARJES Impaktor 350 EVO II for Florida (USA)
Est. Annual Savings€4,096,000
Legal Basis

Florida's FDEP Chapter 62-701 (Florida Administrative Code) regulates solid waste management facilities, including specific provisions for C&D waste processing facilities (Section 62-701.730) and disaster debris management. Following major hurricane events (Ian 2022, Idalia 2023, Milton 2024), Florida activates emergency disaster debris management protocols that temporarily relax permitting for C&D processing but require full documentation of diverted tonnage. Tier 4 Final emission standards apply to off-road diesel equipment. Non-compliance penalties range from USD $1,000 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $140/ST, surging to USD $200/ST during active disaster recovery operations.

Original Act:Florida Department of Environmental Protection (FDEP) Chapter 62-701 FAC — Solid Waste Resource Management Facilities + Disaster Debris Management RulesFDEP Chapter 62-701 (Solid Waste Facilities) + Disaster Debris Management Rules
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 350 EVO II
Mechanisms:accelerated depreciationcit deduction
✓ 100% ACCEL. DEPRECIATION
Drive:dieselEmission:Tier 4_FinalFuel:24 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
19 Sept 2026
Florida (USA)
ACTIVE

1. Regulatory Basis

Original Act: Florida Department of Environmental Protection (FDEP) Chapter 62-701 FAC — Solid Waste Resource Management Facilities + Disaster Debris Management Rules
1. Regulatory Basis: Florida's FDEP Chapter 62-701 (Florida Administrative Code) regulates solid waste management facilities, including specific provisions for C&D waste processing facilities (Section 62-701.730) and disaster debris management. Following major hurricane events (Ian 2022, Idalia 2023, Milton 2024), Florida activates emergency disaster debris management protocols that temporarily relax permitting for C&D processing but require full documentation of diverted tonnage. Tier 4 Final emission standards apply to off-road diesel equipment. Non-compliance penalties range from USD $1,000 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $140/ST, surging to USD $200/ST during active disaster recovery operations.
Regulatory Act: FDEP Chapter 62-701 (Solid Waste Facilities) + Disaster Debris Management Rules

2. Economic Impact Analysis

ParameterValue
RegionFlorida (USA)
Landfill Gate Fee128 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemARJES Impaktor 350 EVO II
Drive TypeDIESEL
Emission StandardTier 4_Final
Estimated Annual Gate-Fee Savings
€4,096,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€45,600(incl. AdBlue €1,642)
Maintenance€24,000
Total Annual OPEX€71,242
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved