AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
CH // COMPLIANCE🇨🇭 ACTIVE

SwitzerlandARJES Impaktor 1100

▸ Regulatory Mandate

“Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.”

Original Act:Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
Source: Regulatory data graphReview required
ARJES Impaktor 1100 — recommended shredder for Switzerland
Power
585 kW
Drive
diesel
Emission
Stage V
List Price
€479K
Landfill Gate Fee
85EUR/t
Mixed C&D waste · 5 EUR/t clean fraction
Est. Annual Savings
€2720K
€2,720,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€114K
€113,510 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€86,400
AdBlue / yr
€3,110
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // CH
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 85 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€2,720,000
85 EUR/t × 40,000 t × 80% diversion
ARJES Impaktor 1100 for Switzerland
Est. Annual Savings€2,720,000
Legal Basis

Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.

Original Act:Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 1100
Mechanisms:vat exemptionaccelerated depreciationamortization shield
✓ VAT EXEMPT✓ 40% ACCEL. DEPRECIATION
Drive:dieselEmission:Stage VFuel:24 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
15 Sept 2026
Switzerland
ACTIVE

1. Regulatory Basis

Original Act: Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
1. Regulatory Basis: Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.
Regulatory Act: Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)

2. Economic Impact Analysis

ParameterValue
RegionSwitzerland
Landfill Gate Fee85 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemARJES Impaktor 1100
Drive TypeDIESEL
Emission StandardStage V
Estimated Annual Gate-Fee Savings
€2,720,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€86,400(incl. AdBlue €3,110)
Maintenance€24,000
Total Annual OPEX€113,510
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved