AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03NEWS
Request
SG // COMPLIANCE🇸🇬 ACTIVE

SingaporeIMPAKTOR 350 EVO II

▸ Regulatory Mandate

“Singapore's Zero Waste Masterplan, enforced by NEA under the Resource Sustainability Act 2019, mandates on-site crushing and C&D waste recovery for all major demolition projects (>500 tonnes C&D waste). The Carbon Tax Act imposes a tiered carbon tax escalating from S$25/t CO2e (2024) to S$45/t (2026) and S$75/t (2028). Non-compliant operators face disqualification from the BCA public tender registry. The electric ARJES Impaktor 250 e-EVO II is the recommended system for SG urban demolition operations, leveraging SG's high industrial electricity reliability and eliminating carbon-tax exposure.”

Original Act:《资源可持续性法案》2019 + 《环境保护与管理法》(第94A章)Resource Sustainability Act 2019 + Environmental Protection and Management Act (Cap. 94A)
★ MINISTRY APPROVEDactive
IMPAKTOR 350 EVO II — recommended shredder for Singapore
Power
175 kW
Drive
diesel
Emission
Tier 4_Final
List Price
€170K
Landfill Gate Fee
58EUR/t
Mixed C&D waste · 18 EUR/t clean fraction
Est. Annual Savings
€1856K
€1,856,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€81K
€80,566 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€54,600
AdBlue / yr
€1,966
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // SG
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 58 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€1,856,000
58 EUR/t × 40,000 t × 80% diversion
IMPAKTOR 350 EVO II for Singapore
Est. Annual Savings€1,856,000
Legal Basis

Singapore's Zero Waste Masterplan, enforced by NEA under the Resource Sustainability Act 2019, mandates on-site crushing and C&D waste recovery for all major demolition projects (>500 tonnes C&D waste). The Carbon Tax Act imposes a tiered carbon tax escalating from S$25/t CO2e (2024) to S$45/t (2026) and S$75/t (2028). Non-compliant operators face disqualification from the BCA public tender registry. The electric ARJES Impaktor 250 e-EVO II is the recommended system for SG urban demolition operations, leveraging SG's high industrial electricity reliability and eliminating carbon-tax exposure.

Original Act:《资源可持续性法案》2019 + 《环境保护与管理法》(第94A章)Resource Sustainability Act 2019 + Environmental Protection and Management Act (Cap. 94A)
FISCAL_SHIELD // INCENTIVES· IMPAKTOR 350 EVO II
Mechanisms:accelerated depreciationcit deduction
✓ 100% ACCEL. DEPRECIATION
Drive:dieselEmission:Tier 4_FinalFuel:21 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
24 Aug 2026
Singapore
ACTIVE

1. Regulatory Basis

Original Act: 《资源可持续性法案》2019 + 《环境保护与管理法》(第94A章)
1. Regulatory Basis: Singapore's Zero Waste Masterplan, enforced by NEA under the Resource Sustainability Act 2019, mandates on-site crushing and C&D waste recovery for all major demolition projects (>500 tonnes C&D waste). The Carbon Tax Act imposes a tiered carbon tax escalating from S$25/t CO2e (2024) to S$45/t (2026) and S$75/t (2028). Non-compliant operators face disqualification from the BCA public tender registry. The electric ARJES Impaktor 250 e-EVO II is the recommended system for SG urban demolition operations, leveraging SG's high industrial electricity reliability and eliminating carbon-tax exposure.
Regulatory Act: Resource Sustainability Act 2019 + Environmental Protection and Management Act (Cap. 94A)

2. Economic Impact Analysis

ParameterValue
RegionSingapore
Landfill Gate Fee58 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemIMPAKTOR 350 EVO II
Drive TypeDIESEL
Emission StandardTier 4_Final
Estimated Annual Gate-Fee Savings
€1,856,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€54,600(incl. AdBlue €1,966)
Maintenance€24,000
Total Annual OPEX€80,566