AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
RS // COMPLIANCE🇷🇸 ACTIVE

SerbiaARJES Impaktor 350 EVO II

▸ Regulatory Mandate

“Waste Management Law (Official Gazette of Serbia, No. 109/2025) requires C&D waste landfilled to be reduced by at least 30% by 2028 relative to 2020 levels. Article 42 provides for progressive penalties of up to 200% of the base levy for exceeding permitted quantities.”

Original Act:Zakon o upravljanju otpadom (Sl. glasnik RS, br. 109/2025)Zakon o upravljanju otpadom 109/2025
Source: Regulatory data graphReview required
ARJES Impaktor 350 EVO II — recommended shredder for Serbia
Power
175 kW
Drive
diesel
Emission
Stage V
List Price
€170K
Landfill Gate Fee
25EUR/t
Mixed C&D waste · 7 EUR/t clean fraction
Est. Annual Savings
€800K
€800,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€102K
€102,438 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€75,712
AdBlue / yr
€2,726
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // RS
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 25 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€800,000
25 EUR/t × 40,000 t × 80% diversion
ARJES Impaktor 350 EVO II for Serbia
Est. Annual Savings€800,000
Legal Basis

Waste Management Law (Official Gazette of Serbia, No. 109/2025) requires C&D waste landfilled to be reduced by at least 30% by 2028 relative to 2020 levels. Article 42 provides for progressive penalties of up to 200% of the base levy for exceeding permitted quantities.

Original Act:Zakon o upravljanju otpadom (Sl. glasnik RS, br. 109/2025)Zakon o upravljanju otpadom 109/2025
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 350 EVO II
Mechanisms:amortization shield
Drive:dieselEmission:Stage VFuel:23.66 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
09 Sept 2026
Serbia
ACTIVE

1. Regulatory Basis

Original Act: Zakon o upravljanju otpadom (Sl. glasnik RS, br. 109/2025)
1. Regulatory Basis: Waste Management Law (Official Gazette of Serbia, No. 109/2025) requires C&D waste landfilled to be reduced by at least 30% by 2028 relative to 2020 levels. Article 42 provides for progressive penalties of up to 200% of the base levy for exceeding permitted quantities.
Regulatory Act: Zakon o upravljanju otpadom 109/2025

2. Economic Impact Analysis

ParameterValue
RegionSerbia
Landfill Gate Fee25 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemARJES Impaktor 350 EVO II
Drive TypeDIESEL
Emission StandardStage V
Estimated Annual Gate-Fee Savings
€800,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€75,712(incl. AdBlue €2,726)
Maintenance€24,000
Total Annual OPEX€102,438
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved