▸ Regulatory Mandate“Vision 2030 NTP directly bans unsorted reinforced concrete disposal at Riyadh and Jeddah landfills. EUR 64/t gate fee creates the strongest MENA penalty arbitrage. OTR tire processing capability required for mining sector integration.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Landfill tax preset: 64 EUR/t · Diversion rate: 80%
Vision 2030 NTP directly bans unsorted reinforced concrete disposal at Riyadh and Jeddah landfills. EUR 64/t gate fee creates the strongest MENA penalty arbitrage. OTR tire processing capability required for mining sector integration.
| Parameter | Value |
|---|---|
| Region | Saudi Arabia |
| Landfill Gate Fee | 64 EUR/t |
| Annual Throughput | 40,000 t/yr |
| Landfill Diversion Rate | 80% |
| Recommended System | IMPAKTOR 1100 |
| Drive Type | DIESEL |
| Emission Standard | Tier 3 |
| OPEX Component | Annual Cost (EUR) |
|---|---|
| Diesel + AdBlue | €27,300(incl. AdBlue €983) |
| Maintenance | €24,000 |
| Total Annual OPEX | €52,283 |