AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO II//[ 02 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO II//[ 02 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
PL // COMPLIANCE🇵🇱 PENDING

Poland — IMPAKTOR 1100

▸ Regulatory Mandate

“Poland's Waste Act (Ustawa o odpadach z dnia 14 grudnia 2012 r., published Dz.U. 2013 poz. 21) governs waste management including construction and demolition waste. The penalty provision is not yet verified: Art. 82 concerns the BDO (waste database) electronic register, not penalties, and the actual penalty article requires identification from the ISAP consolidated text. The enforcement authority is not identified. No national statutory gate fee exists — gate fees are commercial/market-based and are not published in canonical data. EU Landfill Directive 1999/31/EC applies.”

Original Act:Ustawa o odpadach z dnia 14 grudnia 2012 r. (Dz.U. 2013 poz. 21) + Dyrektywa składowiskowa 1999/31/WEUstawa o odpadach (Waste Act of 14 December 2012, Dz.U. 2013 poz. 21) + EU Landfill Directive
Source: Regulatory data graphReview required
IMPAKTOR 1100 — recommended shredder for Poland
Power
585 kW
Drive
diesel
Emission
Stage V
List Price
€479K
Landfill Gate Fee
MISSING · not authority-verified
Authority-grade gate fee data unavailable.
Est. Annual Savings
Not modeled
Authority-grade gate fee data unavailable.
Annual OPEX (TCO)
€100K
€99,986 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€73,346
AdBlue / yr
€2,640
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // PL
40,000t/yr
5,000 t80,000 t

Landfill tax preset unavailable — gate fee data missing.

Est. Annual Gate-Fee Savings
Not modeled
Authority-grade gate fee data unavailable.
IMPAKTOR 1100 for Poland
Est. Annual SavingsNot modeled
Legal Basis

Poland's Waste Act (Ustawa o odpadach z dnia 14 grudnia 2012 r., published Dz.U. 2013 poz. 21) governs waste management including construction and demolition waste. The penalty provision is not yet verified: Art. 82 concerns the BDO (waste database) electronic register, not penalties, and the actual penalty article requires identification from the ISAP consolidated text. The enforcement authority is not identified. No national statutory gate fee exists — gate fees are commercial/market-based and are not published in canonical data. EU Landfill Directive 1999/31/EC applies.

Original Act:Ustawa o odpadach z dnia 14 grudnia 2012 r. (Dz.U. 2013 poz. 21) + Dyrektywa składowiskowa 1999/31/WEUstawa o odpadach (Waste Act of 14 December 2012, Dz.U. 2013 poz. 21) + EU Landfill Directive
FISCAL_SHIELD // INCENTIVES· IMPAKTOR 1100
Mechanisms:vat exemptionaccelerated depreciationcit deduction
✓ VAT EXEMPT✓ 30% ACCEL. DEPRECIATION
Drive:dieselEmission:—Fuel:0 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
09 Oct 2026
Poland
PENDING

1. Regulatory Basis

Original Act: Ustawa o odpadach z dnia 14 grudnia 2012 r. (Dz.U. 2013 poz. 21) + Dyrektywa składowiskowa 1999/31/WE
1. Regulatory Basis: Poland's Waste Act (Ustawa o odpadach z dnia 14 grudnia 2012 r., published Dz.U. 2013 poz. 21) governs waste management including construction and demolition waste. The penalty provision is not yet verified: Art. 82 concerns the BDO (waste database) electronic register, not penalties, and the actual penalty article requires identification from the ISAP consolidated text. The enforcement authority is not identified. No national statutory gate fee exists — gate fees are commercial/market-based and are not published in canonical data. EU Landfill Directive 1999/31/EC applies.
Regulatory Act: Ustawa o odpadach (Waste Act of 14 December 2012, Dz.U. 2013 poz. 21) + EU Landfill Directive

2. Economic Impact Analysis

ParameterValue
RegionPoland
Landfill Gate Fee—
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemIMPAKTOR 1100
Drive TypeDIESEL
Emission Standard—
Estimated Annual Gate-Fee Savings
Not modeled
Authority-grade gate fee data unavailable.
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€73,346(incl. AdBlue €2,640)
Maintenance€24,000
Total Annual OPEX€99,986
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved