Waste Management Act (Official Gazette of North Macedonia, No. 67/2024, rev. 2026) mandates on-site separation of construction waste. Article 22 stipulates that buildings cannot receive a Usage Permit without confirmation of proper waste handling.
Waste Management Act (Official Gazette of RM, No. 67/2024, rev. 2026)
Zakon za upravuvanje so otpadoci (Sluzben vesnik na RM, br. 67/2024, rev. 2026)
Waste Management Act (Official Gazette of North Macedonia, No. 67/2024, rev. 2026) mandates on-site separation of construction waste. Article 22 stipulates that buildings cannot receive a Usage Permit without confirmation of proper waste handling.
Zakon za upravuvanje so otpadoci (Sluzben vesnik na RM, br. 67/2024, rev. 2026) propishuva obvrska za razdvojuvanje na gradezen otpad na gradilishte. Chlen 22 utvrduva deka gradezhnite objekti ne moze da dobijat Usage Permit bez potvrda za pravilno spravuvanje so otpadot.
Regulatory Act: Zakon za upravuvanje so otpadoci (rev. 2026)
| Parameter | Value |
|---|---|
| Region | North Macedonia |
| Landfill Gate Fee | 12 EUR/t |
| Annual Throughput | 40,000 t/yr |
| Landfill Diversion Rate | 80% |
| Recommended System | IMPAKTOR 250 EVO I |
| Drive Type | DIESEL |
| Emission Standard | Stage V |
| OPEX Component | Annual Cost (EUR) |
|---|---|
| Diesel + AdBlue | €52,200(incl. AdBlue €1,512) |
| Maintenance | €24,000 |
| Total Annual OPEX | €77,712 |