▸ Regulatory Mandate“Waste Management Act (Official Gazette of North Macedonia, No. 67/2024, rev. 2026) mandates on-site separation of construction waste. Article 22 stipulates that buildings cannot receive a Usage Permit without confirmation of proper waste handling.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Landfill tax preset: 12 EUR/t · Diversion rate: 80%
Waste Management Act (Official Gazette of North Macedonia, No. 67/2024, rev. 2026) mandates on-site separation of construction waste. Article 22 stipulates that buildings cannot receive a Usage Permit without confirmation of proper waste handling.
| Parameter | Value |
|---|---|
| Region | North Macedonia |
| Landfill Gate Fee | 12 EUR/t |
| Annual Throughput | 40,000 t/yr |
| Landfill Diversion Rate | 80% |
| Recommended System | ARJES Impaktor 250 EVO II |
| Drive Type | DIESEL |
| Emission Standard | Stage V |
| OPEX Component | Annual Cost (EUR) |
|---|---|
| Diesel + AdBlue | €52,200(incl. AdBlue €1,879) |
| Maintenance | €24,000 |
| Total Annual OPEX | €78,079 |