▸ Regulatory Mandate“Hong Kong's Environmental Protection Department (EPD) enforces the Construction Waste Disposal Charging Scheme under Cap. 354N, mandating segregated C&D waste disposal at designated Sorting Facilities. Mandatory C&D waste separation and landfill diversion limits apply to all urban Kowloon and Hong Kong Island demolition zones. Non-compliant disposal, illegal dumping, or falsified waste-tracking manifests carry criminal penalties up to HK$500,000 fine and 6 months imprisonment under Cap. 354 §16. Zero-emission electric drive mandate favors the ARJES Impaktor 350 e-EVO II for urban demolition operations.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Landfill tax preset: 120 EUR/t · Diversion rate: 80%
Hong Kong's Environmental Protection Department (EPD) enforces the Construction Waste Disposal Charging Scheme under Cap. 354N, mandating segregated C&D waste disposal at designated Sorting Facilities. Mandatory C&D waste separation and landfill diversion limits apply to all urban Kowloon and Hong Kong Island demolition zones. Non-compliant disposal, illegal dumping, or falsified waste-tracking manifests carry criminal penalties up to HK$500,000 fine and 6 months imprisonment under Cap. 354 §16. Zero-emission electric drive mandate favors the ARJES Impaktor 350 e-EVO II for urban demolition operations.
| Parameter | Value |
|---|---|
| Region | Hong Kong |
| Landfill Gate Fee | 120 EUR/t |
| Annual Throughput | 40,000 t/yr |
| Landfill Diversion Rate | 80% |
| Recommended System | IMPAKTOR 350 EVO II |
| Drive Type | DIESEL |
| Emission Standard | Tier 3 |
| OPEX Component | Annual Cost (EUR) |
|---|---|
| Diesel + AdBlue | €48,400(incl. AdBlue €1,742) |
| Maintenance | €24,000 |
| Total Annual OPEX | €74,142 |