AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03NEWS
Request
DE // COMPLIANCE🇩🇪 ACTIVE

DEIMPAKTOR 1250 D

▸ Regulatory Mandate

“Germany's Circular Economy Act (KrWG) mandates separate collection of C&D waste (§11 KrWG). Landfill gate fees of 60 EUR/t for mixed waste make on-site processing highly economical. BImSchG §20 provides for facility shutdown; KrWG §69 imposes fines up to €50,000. EU Waste Directive 2008/98/EC transposed via KrWG.”

Original Act:Kreislaufwirtschaftsgesetz (KrWG) + Bundes-Immissionsschutzgesetz (BImSchG)KrWG (Kreislaufwirtschaftsgesetz) + BImSchG (Federal Immission Control Act)
★ MINISTRY APPROVEDactive
IMPAKTOR 1250 D — recommended shredder for DE
Power
585 kW
Drive
dual
Emission
Stage V
List Price
€600K
Landfill Gate Fee
60EUR/t
Mixed C&D waste · 18 EUR/t clean fraction
Est. Annual Savings
€1920K
€1,920,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€110K
€109,532 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€82,560
AdBlue / yr
€2,972
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // DE
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 60 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€1,920,000
60 EUR/t × 40,000 t × 80% diversion
IMPAKTOR 1250 D for DE
Est. Annual Savings€1,920,000
Legal Basis

Germany's Circular Economy Act (KrWG) mandates separate collection of C&D waste (§11 KrWG). Landfill gate fees of 60 EUR/t for mixed waste make on-site processing highly economical. BImSchG §20 provides for facility shutdown; KrWG §69 imposes fines up to €50,000. EU Waste Directive 2008/98/EC transposed via KrWG.

Original Act:Kreislaufwirtschaftsgesetz (KrWG) + Bundes-Immissionsschutzgesetz (BImSchG)KrWG (Kreislaufwirtschaftsgesetz) + BImSchG (Federal Immission Control Act)
FISCAL_SHIELD // INCENTIVES· IMPAKTOR 1250 D
Mechanisms:vat exemptionaccelerated depreciationcit deductionamortization shield
✓ VAT EXEMPT✓ 40% ACCEL. DEPRECIATION
Drive:dualEmission:Stage VFuel:24 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
24 Aug 2026
DE
ACTIVE

1. Regulatory Basis

Original Act: Kreislaufwirtschaftsgesetz (KrWG) + Bundes-Immissionsschutzgesetz (BImSchG)
1. Regulatory Basis: Germany's Circular Economy Act (KrWG) mandates separate collection of C&D waste (§11 KrWG). Landfill gate fees of 60 EUR/t for mixed waste make on-site processing highly economical. BImSchG §20 provides for facility shutdown; KrWG §69 imposes fines up to €50,000. EU Waste Directive 2008/98/EC transposed via KrWG.
Regulatory Act: KrWG (Kreislaufwirtschaftsgesetz) + BImSchG (Federal Immission Control Act)

2. Economic Impact Analysis

ParameterValue
RegionDE
Landfill Gate Fee60 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemIMPAKTOR 1250 D
Drive TypeDUAL
Emission StandardStage V
Estimated Annual Gate-Fee Savings
€1,920,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€82,560(incl. AdBlue €2,972)
Maintenance€24,000
Total Annual OPEX€109,532
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs