▸ Regulatory Mandate“Waste Act (RT I 2024, 21, 163) transposes EU ELV Directive with mandatory 5-stream end-of-life vehicle separation. CIT 20% only upon profit distribution, VAT 22%. High EUR 38/t gate fee.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Landfill tax preset: 38 EUR/t · Diversion rate: 80%
Waste Act (RT I 2024, 21, 163) transposes EU ELV Directive with mandatory 5-stream end-of-life vehicle separation. CIT 20% only upon profit distribution, VAT 22%. High EUR 38/t gate fee.
| Parameter | Value |
|---|---|
| Region | Estonia |
| Landfill Gate Fee | 38 EUR/t |
| Annual Throughput | 40,000 t/yr |
| Landfill Diversion Rate | 80% |
| Recommended System | ARJES Impaktor 250 e-EVO II |
| Drive Type | ELECTRIC |
| Emission Standard | Zero Emission |
| OPEX Component | Annual Cost (EUR) |
|---|---|
| Electricity | €27,962 |
| Maintenance | €14,000 |
| Total Annual OPEX | €41,962 |
| Savings vs Diesel Baseline (5yr) | €230,936 |