AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO II//[ 02 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO II//[ 02 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
CN // COMPLIANCE🇨🇳 ACTIVE

China (Tier 1 Hubs) — ARJES Impaktor 350 EVO II

▸ Regulatory Mandate

“The PRC Ecological and Environmental Code (adopted 2026-03-12, effective 2026-08-15) is the current primary environmental statute for the People’s Republic of China. It supersedes and incorporates the prior Environmental Protection Law of the PRC (2014 revision) and the Solid Waste Pollution Prevention and Control Law (2020 revision), which are retained only as HISTORICAL / SOURCE_LINEAGE (SUPERSEDED). Under the 2026 Code, illegal dumping or disposal of construction waste attracts administrative penalties of ¥100,000 to ¥1,000,000 per offence (Art. 1169), with per-day continuous accumulation (Art. 1060) and double-penalty escalation for officers (Art. 1064). Municipalities such as Shanghai and Beijing impose additional local C&D waste recycling mandates with per-tonne surcharges.”

Original Act:《中华人民共和国生态环境法典》(2026年)PRC Ecological and Environmental Code (2026, effective 2026-08-15)
Source: Regulatory data graphReview required
ARJES Impaktor 350 EVO II — recommended shredder for China (Tier 1 Hubs)
Power
175 kW
Drive
diesel
Emission
China VI
List Price
€170K
Landfill Gate Fee
15EUR/t
Mixed C&D waste · 5 EUR/t clean fraction
Est. Annual Savings
€480K
€480,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€67K
€67,305 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€41,800
AdBlue / yr
€1,505
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // CN
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 15 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€480,000
15 EUR/t × 40,000 t × 80% diversion
ARJES Impaktor 350 EVO II for China (Tier 1 Hubs)
Est. Annual Savings€480,000
Legal Basis

The PRC Ecological and Environmental Code (adopted 2026-03-12, effective 2026-08-15) is the current primary environmental statute for the People’s Republic of China. It supersedes and incorporates the prior Environmental Protection Law of the PRC (2014 revision) and the Solid Waste Pollution Prevention and Control Law (2020 revision), which are retained only as HISTORICAL / SOURCE_LINEAGE (SUPERSEDED). Under the 2026 Code, illegal dumping or disposal of construction waste attracts administrative penalties of ¥100,000 to ¥1,000,000 per offence (Art. 1169), with per-day continuous accumulation (Art. 1060) and double-penalty escalation for officers (Art. 1064). Municipalities such as Shanghai and Beijing impose additional local C&D waste recycling mandates with per-tonne surcharges.

Original Act:《中华人民共和国生态环境法典》(2026年)PRC Ecological and Environmental Code (2026, effective 2026-08-15)
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 350 EVO II
Mechanisms:accelerated depreciationsubsidized rate
✓ 100% ACCEL. DEPRECIATION
Drive:dieselEmission:—Fuel:0 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
09 Oct 2026
China (Tier 1 Hubs)
ACTIVE

1. Regulatory Basis

Original Act: 《中华人民共和国生态环境法典》(2026年)
1. Regulatory Basis: The PRC Ecological and Environmental Code (adopted 2026-03-12, effective 2026-08-15) is the current primary environmental statute for the People’s Republic of China. It supersedes and incorporates the prior Environmental Protection Law of the PRC (2014 revision) and the Solid Waste Pollution Prevention and Control Law (2020 revision), which are retained only as HISTORICAL / SOURCE_LINEAGE (SUPERSEDED). Under the 2026 Code, illegal dumping or disposal of construction waste attracts administrative penalties of ¥100,000 to ¥1,000,000 per offence (Art. 1169), with per-day continuous accumulation (Art. 1060) and double-penalty escalation for officers (Art. 1064). Municipalities such as Shanghai and Beijing impose additional local C&D waste recycling mandates with per-tonne surcharges.
Regulatory Act: PRC Ecological and Environmental Code (2026, effective 2026-08-15)

2. Economic Impact Analysis

ParameterValue
RegionChina (Tier 1 Hubs)
Landfill Gate Fee15 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemARJES Impaktor 350 EVO II
Drive TypeDIESEL
Emission Standard—
Estimated Annual Gate-Fee Savings
€480,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€41,800(incl. AdBlue €1,505)
Maintenance€24,000
Total Annual OPEX€67,305
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved