AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
CL // COMPLIANCE🇨🇱 ACTIVE

ChileARJES Impaktor 350 EVO II

▸ Regulatory Mandate

“Chile's Ley REP 20.920 (in force since 2019, with C&D waste regulations fully phased in by 2026) extends producer responsibility to construction and demolition waste, mandating that producers fund collection, recovery, and final disposal of waste generated by their products. Supreme Decree 148/2003 regulates sanitary landfill operations and imposes escalating gate fees for non-recyclable fractions. The current mixed C&D gate fee is approximately USD $45/t”

Original Act:Ley 20.920 (Ley REP — Responsabilidad Extendida del Productor) + Decreto Supremo 148/2003Ley REP 20.920 (Extended Producer Responsibility) + DS 148/2003 Sanitary Landfill Regulation
Source: Regulatory data graphReview required
ARJES Impaktor 350 EVO II — recommended shredder for Chile
Power
175 kW
Drive
diesel
Emission
Tier 4_Final
List Price
€170K
Landfill Gate Fee
45EUR/t
Mixed C&D waste · 12 EUR/t clean fraction
Est. Annual Savings
€1440K
€1,440,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€89K
€88,646 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€62,400
AdBlue / yr
€2,246
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // CL
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 45 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€1,440,000
45 EUR/t × 40,000 t × 80% diversion
ARJES Impaktor 350 EVO II for Chile
Est. Annual Savings€1,440,000
Legal Basis

Chile's Ley REP 20.920 (in force since 2019, with C&D waste regulations fully phased in by 2026) extends producer responsibility to construction and demolition waste, mandating that producers fund collection, recovery, and final disposal of waste generated by their products. Supreme Decree 148/2003 regulates sanitary landfill operations and imposes escalating gate fees for non-recyclable fractions. The current mixed C&D gate fee is approximately USD $45/t

Original Act:Ley 20.920 (Ley REP — Responsabilidad Extendida del Productor) + Decreto Supremo 148/2003Ley REP 20.920 (Extended Producer Responsibility) + DS 148/2003 Sanitary Landfill Regulation
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 350 EVO II
Mechanisms:accelerated depreciationvat exemption
✓ VAT EXEMPT✓ 20% ACCEL. DEPRECIATION
Drive:dieselEmission:Tier 4_FinalFuel:24 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
19 Sept 2026
Chile
ACTIVE

1. Regulatory Basis

Original Act: Ley 20.920 (Ley REP — Responsabilidad Extendida del Productor) + Decreto Supremo 148/2003
1. Regulatory Basis: Chile's Ley REP 20.920 (in force since 2019, with C&D waste regulations fully phased in by 2026) extends producer responsibility to construction and demolition waste, mandating that producers fund collection, recovery, and final disposal of waste generated by their products. Supreme Decree 148/2003 regulates sanitary landfill operations and imposes escalating gate fees for non-recyclable fractions. The current mixed C&D gate fee is approximately USD $45/t
Regulatory Act: Ley REP 20.920 (Extended Producer Responsibility) + DS 148/2003 Sanitary Landfill Regulation

2. Economic Impact Analysis

ParameterValue
RegionChile
Landfill Gate Fee45 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemARJES Impaktor 350 EVO II
Drive TypeDIESEL
Emission StandardTier 4_Final
Estimated Annual Gate-Fee Savings
€1,440,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€62,400(incl. AdBlue €2,246)
Maintenance€24,000
Total Annual OPEX€88,646
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved