AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUTOR
ARJESIMPAKTOR
01Home
02MODELS

// COMPACT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// HEAVY

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER HEAVY

[ 01 ]1250 D//[ 02 ]1250 E//

// Machinery Archive

[ 00 ]All Models//[ 99 ]PDF Library//
Active
03SOLUTIONS
04TECH
05COMPLIANCE
Request
BR // COMPLIANCE🇧🇷 ACTIVE

BrazilIMPAKTOR 350 EVO II

▸ Regulatory Mandate

“Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.”

Original Act:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
Source: Regulatory data graphReview required
IMPAKTOR 350 EVO II — recommended shredder for Brazil
Power
175 kW
Drive
diesel
Emission
Tier 4_Final
List Price
€170K
Landfill Gate Fee
55EUR/t
Mixed C&D waste · 15 EUR/t clean fraction
Est. Annual Savings
€1760K
€1,760,000 at 40,000 t/yr, 80% diversion
Annual OPEX (TCO)
€72K
€71,863 · energy + AdBlue + maintenance · 2,000 h/yr
Energy / yr
€46,200
AdBlue / yr
€1,663
Maintenance / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Calculator // BR
40,000t/yr
5,000 t80,000 t

Landfill tax preset: 55 EUR/t · Diversion rate: 80%

Est. Annual Gate-Fee Savings
€1,760,000
55 EUR/t × 40,000 t × 80% diversion
IMPAKTOR 350 EVO II for Brazil
Est. Annual Savings€1,760,000
Legal Basis

Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.

Original Act:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
FISCAL_SHIELD // INCENTIVES· IMPAKTOR 350 EVO II
Mechanisms:accelerated depreciationcit deduction
✓ 20% ACCEL. DEPRECIATION
Drive:dieselEmission:Tier 4_FinalFuel:22 L/h
← Back to Compliance Hub
AXE MACHINERY
Official ARJES Distributor — Compliance Report
19 Sept 2026
Brazil
ACTIVE

1. Regulatory Basis

Original Act: Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002
1. Regulatory Basis: Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.
Regulatory Act: Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002

2. Economic Impact Analysis

ParameterValue
RegionBrazil
Landfill Gate Fee55 EUR/t
Annual Throughput40,000 t/yr
Landfill Diversion Rate80%
Recommended SystemIMPAKTOR 350 EVO II
Drive TypeDIESEL
Emission StandardTier 4_Final
Estimated Annual Gate-Fee Savings
€1,760,000
at 40,000 t/yr, 80% landfill diversion
OPEX ComponentAnnual Cost (EUR)
Diesel + AdBlue€46,200(incl. AdBlue €1,663)
Maintenance€24,000
Total Annual OPEX€71,863
AXE Machinery — Official ARJES GmbH Distribution Partnerarjes-impaktor.rs

// INFORMATION HUB

Research & EngineeringCompliance HubNEWSLogistics & Legacy

Industrial Solutions by Material // Operational Hubs

Concrete CrushingWood RecyclingScrap Metal ProcessingMunicipal Solid WasteConstruction DemolitionOTR Tire RecyclingELV RecyclingAll Solutions →

// COMPARISON MATRIX

IN-HOUSE vs SUBCONTRACTINGMOBILE vs STATIONARYDIESEL vs ELECTRICTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000All Comparisons →

// CONNECT & CONTACT

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
AXE Machinery Logo
ARJESIMPAKTOR
LegalPrivacy PolicyTerms of Use
© 2026 AXE Machinery. All Rights Reserved