Logotipo de AXE Machinery
Logotipo de AXE Machinery
Maquinaria//DISTRIBUIDOR
ARJESIMPAKTOR
01Inicio
02MODELOS

// COMPACTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// ESTÁNDAR

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESADO

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESADO

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivo de máquinas

[ 00 ]Todos los modelos//[ 99 ]Biblioteca PDF//
Activo
03SOLUCIONES
04TECH
05CUMPLIMIENTO
Solicitar Dossier
US-TX // CUMPLIMIENTO🇺🇸 ACTIVE

Texas (EE. UU.)ARJES Impaktor 350 EVO II

▸ Mandato regulatorio

“Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).”

Acto original:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
Fuente: Registro de datos regulatoriosRevisión requerida
ARJES Impaktor 350 EVO II — recommended shredder for Texas (EE. UU.)
Potencia
175 kW
Transmisión
diesel
Emisiones
Tier 4_Final
Precio de lista
€170K
Tasa de vertedero
110EUR/t
Residuos C&D mixtos · 28 EUR/t fracción limpia
Ahorro anual estimado
€3520K
€3,520,000 a 40,000 t/año, desvío 80%
OPEX anual (TCO)
€66K
€66,269 · combustible + AdBlue + mantenimiento · 2 000 h/año
Energía / año
€40,800
AdBlue / año
€1,469
Mantenimiento / año
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculadora ROI // US-TX
40,000t/año
5,000 t80,000 t

Tasa de vertedero: 110 EUR/t · Desvío: 80%

Ahorro anual estimado
€3,520,000
110 EUR/t × 40,000 t × 80% desvío
ARJES Impaktor 350 EVO II para Texas (EE. UU.)
Ahorro anual estimado€3,520,000
Base legal

Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).

Acto original:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
ESCUDO_FISCAL // INCENTIVOS· ARJES Impaktor 350 EVO II
Mecanismos:accelerated depreciationcit deduction
✓ 100% AMORT. ACELERADA
Transmisión:dieselEmisiones:Tier 4_FinalCombustible:24 L/h
← Volver al Hub de cumplimiento
AXE MACHINERY
Distribuidor oficial ARJES — Informe de cumplimiento
19 Sept 2026
Texas (EE. UU.)
ACTIVE

1. Base regulatoria

Acto original: Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration Program
1. Base regulatoria: Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).
Acto regulatorio: TCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration

2. Análisis de impacto económico

ParámetroValor
RegiónTexas (EE. UU.)
Tasa de vertedero110 EUR/t
Capacidad anual40,000 t/yr
Tasa de desvío80%
Sistema recomendadoARJES Impaktor 350 EVO II
Tipo de transmisiónDIESEL
Norma de emisionesTier 4_Final
Ahorro anual estimado (tasa de vertedero)
€3,520,000
a 40,000 t/año, desvío 80%
Componente OPEXCosto anual (EUR)
Diésel + AdBlue€40,800(incl. AdBlue €1,469)
Mantenimiento€24,000
Total OPEX anual€66,269
AXE Machinery — Socio de distribución oficial ARJES GmbHarjes-impaktor.rs

// CENTRO DE INFORMACIÓN

Investigación & IngenieríaHub de cumplimientoNOTICIASLogística y legado

Soluciones industriales por material // Hubs operativos

Trituración de hormigónReciclaje de maderaProcesamiento de chatarraResiduos sólidos urbanosConstrucción y demoliciónReciclaje neumáticos OTRReciclaje VFUTodas las soluciones →

// MATRIZ DE COMPARACIÓN

PROPIO vs SUBCONTRATACIÓNMÓVIL vs ESTACIONARIODIÉSEL vs ELÉCTRICOTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Todas las comparaciones →

// CONTACTO

+381644422555
info@arjes-impaktor.rs
BC Usce, Torre 1Bulevar Mihajla Pupina 611070 Belgrado, SerbiaUTC+144.8125 N, 20.4612 E
Logotipo de AXE Machinery
ARJESIMPAKTOR
Aviso legalPolítica de privacidadCondiciones de uso
© 2026 AXE Machinery. Todos los derechos reservados