▸ Mandato regulatorio“Vision 2030 NTP directly bans unsorted reinforced concrete disposal at Riyadh and Jeddah landfills. EUR 64/t gate fee creates the strongest MENA penalty arbitrage. OTR tire processing capability required for mining sector integration.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Tasa de vertedero: 64 EUR/t · Desvío: 80%
Vision 2030 NTP directly bans unsorted reinforced concrete disposal at Riyadh and Jeddah landfills. EUR 64/t gate fee creates the strongest MENA penalty arbitrage. OTR tire processing capability required for mining sector integration.
| Parámetro | Valor |
|---|---|
| Región | Arabia Saudita |
| Tasa de vertedero | 64 EUR/t |
| Capacidad anual | 40,000 t/yr |
| Tasa de desvío | 80% |
| Sistema recomendado | IMPAKTOR 1100 |
| Tipo de transmisión | DIESEL |
| Norma de emisiones | Tier 3 |
| Componente OPEX | Costo anual (EUR) |
|---|---|
| Diésel + AdBlue | €27,300(incl. AdBlue €983) |
| Mantenimiento | €24,000 |
| Total OPEX anual | €52,283 |