▸ Mandato regulatorio“GEO 92/2021 establishes a 70% C&D waste recycling target for 2026, with EUR 32/t gate fee and 30% first-year accelerated depreciation. Article 17 requires waste management plans for all construction projects exceeding 500 m².”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Tasa de vertedero: 32 EUR/t · Desvío: 80%
GEO 92/2021 establishes a 70% C&D waste recycling target for 2026, with EUR 32/t gate fee and 30% first-year accelerated depreciation. Article 17 requires waste management plans for all construction projects exceeding 500 m².
| Parámetro | Valor |
|---|---|
| Región | Rumanía |
| Tasa de vertedero | 32 EUR/t |
| Capacidad anual | 40,000 t/yr |
| Tasa de desvío | 80% |
| Sistema recomendado | ARJES Impaktor 350 EVO II |
| Tipo de transmisión | DIESEL |
| Norma de emisiones | Stage V |
| Componente OPEX | Costo anual (EUR) |
|---|---|
| Diésel + AdBlue | €71,926(incl. AdBlue €2,589) |
| Mantenimiento | €24,000 |
| Total OPEX anual | €98,516 |