Logotipo de AXE Machinery
Logotipo de AXE Machinery
Maquinaria//DISTRIBUIDOR
ARJESIMPAKTOR
01Inicio
02MODELOS

// COMPACTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// ESTÁNDAR

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESADO

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESADO

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivo de máquinas

[ 00 ]Todos los modelos//[ 99 ]Biblioteca PDF//
Activo
03SOLUCIONES
04TECH
05CUMPLIMIENTO
Solicitar Dossier
QA // CUMPLIMIENTO🇶🇦 ACTIVE

CatarARJES Impaktor 1100

▸ Mandato regulatorio

“Qatar's Ministry of Municipality and Environment (MME) enforces strict waste disposal standards, requiring Construction Waste Management Plans (CWMPs) for all major projects. The country has accumulated approximately 40 million tonnes of construction waste. The C&D waste management market is valued at USD 1.1 billion (2025). The standard disposal rate reaches approximately 420 QAR/t (~€105/t) for mixed waste, with a lower rate of ~13 QAR/t (~€3/t) for inert materials. Dumping waste in unauthorized locations is a violation punishable by law. The National Development Strategy targets significant recycling improvements. The high gate fee makes on-site C&D processing extremely economical.”

Acto original:معايير إدارة النفايات بوزارة البلدية والبيئة وخطط إدارة نفايات البناء (CWMPs)Ministry of Municipality and Environment (MME) Waste Management Standards & Construction Waste Management Plans (CWMPs)
Fuente: Registro de datos regulatoriosRevisión requerida
ARJES Impaktor 1100 — recommended shredder for Catar
Potencia
585 kW
Transmisión
diesel
Emisiones
Tier 3
Precio de lista
€479K
Tasa de vertedero
105EUR/t
Residuos C&D mixtos · 3 EUR/t fracción limpia
Ahorro anual estimado
€3360K
€3,360,000 a 40,000 t/año, desvío 80%
OPEX anual (TCO)
€51K
€51,350 · combustible + AdBlue + mantenimiento · 2 000 h/año
Energía / año
€26,400
AdBlue / año
€950
Mantenimiento / año
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculadora ROI // QA
40,000t/año
5,000 t80,000 t

Tasa de vertedero: 105 EUR/t · Desvío: 80%

Ahorro anual estimado
€3,360,000
105 EUR/t × 40,000 t × 80% desvío
ARJES Impaktor 1100 para Catar
Ahorro anual estimado€3,360,000
Base legal

Qatar's Ministry of Municipality and Environment (MME) enforces strict waste disposal standards, requiring Construction Waste Management Plans (CWMPs) for all major projects. The country has accumulated approximately 40 million tonnes of construction waste. The C&D waste management market is valued at USD 1.1 billion (2025). The standard disposal rate reaches approximately 420 QAR/t (~€105/t) for mixed waste, with a lower rate of ~13 QAR/t (~€3/t) for inert materials. Dumping waste in unauthorized locations is a violation punishable by law. The National Development Strategy targets significant recycling improvements. The high gate fee makes on-site C&D processing extremely economical.

Acto original:معايير إدارة النفايات بوزارة البلدية والبيئة وخطط إدارة نفايات البناء (CWMPs)Ministry of Municipality and Environment (MME) Waste Management Standards & Construction Waste Management Plans (CWMPs)
ESCUDO_FISCAL // INCENTIVOS· ARJES Impaktor 1100
Mecanismos:vat exemptionaccelerated depreciation
✓ EXENTO DE IVA✓ 35% AMORT. ACELERADA
Transmisión:dieselEmisiones:Tier 3Combustible:24 L/h
← Volver al Hub de cumplimiento
AXE MACHINERY
Distribuidor oficial ARJES — Informe de cumplimiento
15 Sept 2026
Catar
ACTIVE

1. Base regulatoria

Acto original: معايير إدارة النفايات بوزارة البلدية والبيئة وخطط إدارة نفايات البناء (CWMPs)
1. Base regulatoria: Qatar's Ministry of Municipality and Environment (MME) enforces strict waste disposal standards, requiring Construction Waste Management Plans (CWMPs) for all major projects. The country has accumulated approximately 40 million tonnes of construction waste. The C&D waste management market is valued at USD 1.1 billion (2025). The standard disposal rate reaches approximately 420 QAR/t (~€105/t) for mixed waste, with a lower rate of ~13 QAR/t (~€3/t) for inert materials. Dumping waste in unauthorized locations is a violation punishable by law. The National Development Strategy targets significant recycling improvements. The high gate fee makes on-site C&D processing extremely economical.
Acto regulatorio: Ministry of Municipality and Environment (MME) Waste Management Standards & Construction Waste Management Plans (CWMPs)

2. Análisis de impacto económico

ParámetroValor
RegiónCatar
Tasa de vertedero105 EUR/t
Capacidad anual40,000 t/yr
Tasa de desvío80%
Sistema recomendadoARJES Impaktor 1100
Tipo de transmisiónDIESEL
Norma de emisionesTier 3
Ahorro anual estimado (tasa de vertedero)
€3,360,000
a 40,000 t/año, desvío 80%
Componente OPEXCosto anual (EUR)
Diésel + AdBlue€26,400(incl. AdBlue €950)
Mantenimiento€24,000
Total OPEX anual€51,350
AXE Machinery — Socio de distribución oficial ARJES GmbHarjes-impaktor.rs

// CENTRO DE INFORMACIÓN

Investigación & IngenieríaHub de cumplimientoNOTICIASLogística y legado

Soluciones industriales por material // Hubs operativos

Trituración de hormigónReciclaje de maderaProcesamiento de chatarraResiduos sólidos urbanosConstrucción y demoliciónReciclaje neumáticos OTRReciclaje VFUTodas las soluciones →

// MATRIZ DE COMPARACIÓN

PROPIO vs SUBCONTRATACIÓNMÓVIL vs ESTACIONARIODIÉSEL vs ELÉCTRICOTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Todas las comparaciones →

// CONTACTO

+381644422555
info@arjes-impaktor.rs
BC Usce, Torre 1Bulevar Mihajla Pupina 611070 Belgrado, SerbiaUTC+144.8125 N, 20.4612 E
Logotipo de AXE Machinery
ARJESIMPAKTOR
Aviso legalPolítica de privacidadCondiciones de uso
© 2026 AXE Machinery. Todos los derechos reservados