Logotipo de AXE Machinery
Logotipo de AXE Machinery
Maquinaria//DISTRIBUIDOR
ARJESIMPAKTOR
01Inicio
02MODELOS

// COMPACTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// ESTÁNDAR

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESADO

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESADO

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivo de máquinas

[ 00 ]Todos los modelos//[ 99 ]Biblioteca PDF//
Activo
03SOLUCIONES
04TECH
05CUMPLIMIENTO
Solicitar Dossier
NO // CUMPLIMIENTO🇳🇴 ACTIVE

NoruegaARJES Impaktor 1100

▸ Mandato regulatorio

“Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.”

Acto original:Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020
Fuente: Registro de datos regulatoriosRevisión requerida
ARJES Impaktor 1100 — recommended shredder for Noruega
Potencia
585 kW
Transmisión
diesel
Emisiones
Stage V
Precio de lista
€479K
Tasa de vertedero
50EUR/t
Residuos C&D mixtos · 8 EUR/t fracción limpia
Ahorro anual estimado
€1600K
€1,600,000 a 40,000 t/año, desvío 80%
OPEX anual (TCO)
€116K
€115,997 · combustible + AdBlue + mantenimiento · 2 000 h/año
Energía / año
€88,800
AdBlue / año
€3,197
Mantenimiento / año
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculadora ROI // NO
40,000t/año
5,000 t80,000 t

Tasa de vertedero: 50 EUR/t · Desvío: 80%

Ahorro anual estimado
€1,600,000
50 EUR/t × 40,000 t × 80% desvío
ARJES Impaktor 1100 para Noruega
Ahorro anual estimado€1,600,000
Base legal

Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.

Acto original:Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020
ESCUDO_FISCAL // INCENTIVOS· ARJES Impaktor 1100
Mecanismos:vat exemptionaccelerated depreciationamortization shield
✓ EXENTO DE IVA✓ 40% AMORT. ACELERADA
Transmisión:dieselEmisiones:Stage VCombustible:24 L/h
← Volver al Hub de cumplimiento
AXE MACHINERY
Distribuidor oficial ARJES — Informe de cumplimiento
15 Sept 2026
Noruega
ACTIVE

1. Base regulatoria

Acto original: Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)
1. Base regulatoria: Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.
Acto regulatorio: Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020

2. Análisis de impacto económico

ParámetroValor
RegiónNoruega
Tasa de vertedero50 EUR/t
Capacidad anual40,000 t/yr
Tasa de desvío80%
Sistema recomendadoARJES Impaktor 1100
Tipo de transmisiónDIESEL
Norma de emisionesStage V
Ahorro anual estimado (tasa de vertedero)
€1,600,000
a 40,000 t/año, desvío 80%
Componente OPEXCosto anual (EUR)
Diésel + AdBlue€88,800(incl. AdBlue €3,197)
Mantenimiento€24,000
Total OPEX anual€115,997
AXE Machinery — Socio de distribución oficial ARJES GmbHarjes-impaktor.rs

// CENTRO DE INFORMACIÓN

Investigación & IngenieríaHub de cumplimientoNOTICIASLogística y legado

Soluciones industriales por material // Hubs operativos

Trituración de hormigónReciclaje de maderaProcesamiento de chatarraResiduos sólidos urbanosConstrucción y demoliciónReciclaje neumáticos OTRReciclaje VFUTodas las soluciones →

// MATRIZ DE COMPARACIÓN

PROPIO vs SUBCONTRATACIÓNMÓVIL vs ESTACIONARIODIÉSEL vs ELÉCTRICOTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Todas las comparaciones →

// CONTACTO

+381644422555
info@arjes-impaktor.rs
BC Usce, Torre 1Bulevar Mihajla Pupina 611070 Belgrado, SerbiaUTC+144.8125 N, 20.4612 E
Logotipo de AXE Machinery
ARJESIMPAKTOR
Aviso legalPolítica de privacidadCondiciones de uso
© 2026 AXE Machinery. Todos los derechos reservados