▸ Mandato regulatorio“Waste Management Act (Official Gazette of North Macedonia, No. 67/2024, rev. 2026) mandates on-site separation of construction waste. Article 22 stipulates that buildings cannot receive a Usage Permit without confirmation of proper waste handling.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Tasa de vertedero: 12 EUR/t · Desvío: 80%
Waste Management Act (Official Gazette of North Macedonia, No. 67/2024, rev. 2026) mandates on-site separation of construction waste. Article 22 stipulates that buildings cannot receive a Usage Permit without confirmation of proper waste handling.
| Parámetro | Valor |
|---|---|
| Región | Macedonia del Norte |
| Tasa de vertedero | 12 EUR/t |
| Capacidad anual | 40,000 t/yr |
| Tasa de desvío | 80% |
| Sistema recomendado | ARJES Impaktor 250 EVO II |
| Tipo de transmisión | DIESEL |
| Norma de emisiones | Stage V |
| Componente OPEX | Costo anual (EUR) |
|---|---|
| Diésel + AdBlue | €52,200(incl. AdBlue €1,879) |
| Mantenimiento | €24,000 |
| Total OPEX anual | €78,079 |