▸ Mandato regulatorio“Waste Act (RT I 2024, 21, 163) transposes EU ELV Directive with mandatory 5-stream end-of-life vehicle separation. CIT 20% only upon profit distribution, VAT 22%. High EUR 38/t gate fee.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Tasa de vertedero: 38 EUR/t · Desvío: 80%
Waste Act (RT I 2024, 21, 163) transposes EU ELV Directive with mandatory 5-stream end-of-life vehicle separation. CIT 20% only upon profit distribution, VAT 22%. High EUR 38/t gate fee.
| Parámetro | Valor |
|---|---|
| Región | Estonia |
| Tasa de vertedero | 38 EUR/t |
| Capacidad anual | 40,000 t/yr |
| Tasa de desvío | 80% |
| Sistema recomendado | ARJES Impaktor 250 e-EVO II |
| Tipo de transmisión | ELECTRIC |
| Norma de emisiones | Zero Emission |
| Componente OPEX | Costo anual (EUR) |
|---|---|
| Electricidad | €27,962 |
| Mantenimiento | €14,000 |
| Total OPEX anual | €41,962 |
| Ahorro vs diésel (5 años) | €230,936 |