Logotipo de AXE Machinery
Logotipo de AXE Machinery
Maquinaria//DISTRIBUIDOR
ARJESIMPAKTOR
01Inicio
02MODELOS

// COMPACTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// ESTÁNDAR

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESADO

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESADO

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivo de máquinas

[ 00 ]Todos los modelos//[ 99 ]Biblioteca PDF//
Activo
03SOLUCIONES
04TECH
05CUMPLIMIENTO
Solicitar Dossier
BR // CUMPLIMIENTO🇧🇷 ACTIVE

BrasilIMPAKTOR 350 EVO II

▸ Mandato regulatorio

“Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.”

Acto original:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
Fuente: Registro de datos regulatoriosRevisión requerida
IMPAKTOR 350 EVO II — recommended shredder for Brasil
Potencia
175 kW
Transmisión
diesel
Emisiones
Tier 4_Final
Precio de lista
€170K
Tasa de vertedero
55EUR/t
Residuos C&D mixtos · 15 EUR/t fracción limpia
Ahorro anual estimado
€1760K
€1,760,000 a 40,000 t/año, desvío 80%
OPEX anual (TCO)
€72K
€71,863 · combustible + AdBlue + mantenimiento · 2 000 h/año
Energía / año
€46,200
AdBlue / año
€1,663
Mantenimiento / año
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculadora ROI // BR
40,000t/año
5,000 t80,000 t

Tasa de vertedero: 55 EUR/t · Desvío: 80%

Ahorro anual estimado
€1,760,000
55 EUR/t × 40,000 t × 80% desvío
IMPAKTOR 350 EVO II para Brasil
Ahorro anual estimado€1,760,000
Base legal

Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.

Acto original:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
ESCUDO_FISCAL // INCENTIVOS· IMPAKTOR 350 EVO II
Mecanismos:accelerated depreciationcit deduction
✓ 20% AMORT. ACELERADA
Transmisión:dieselEmisiones:Tier 4_FinalCombustible:22 L/h
← Volver al Hub de cumplimiento
AXE MACHINERY
Distribuidor oficial ARJES — Informe de cumplimiento
19 Sept 2026
Brasil
ACTIVE

1. Base regulatoria

Acto original: Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002
1. Base regulatoria: Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.
Acto regulatorio: Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002

2. Análisis de impacto económico

ParámetroValor
RegiónBrasil
Tasa de vertedero55 EUR/t
Capacidad anual40,000 t/yr
Tasa de desvío80%
Sistema recomendadoIMPAKTOR 350 EVO II
Tipo de transmisiónDIESEL
Norma de emisionesTier 4_Final
Ahorro anual estimado (tasa de vertedero)
€1,760,000
a 40,000 t/año, desvío 80%
Componente OPEXCosto anual (EUR)
Diésel + AdBlue€46,200(incl. AdBlue €1,663)
Mantenimiento€24,000
Total OPEX anual€71,863
AXE Machinery — Socio de distribución oficial ARJES GmbHarjes-impaktor.rs

// CENTRO DE INFORMACIÓN

Investigación & IngenieríaHub de cumplimientoNOTICIASLogística y legado

Soluciones industriales por material // Hubs operativos

Trituración de hormigónReciclaje de maderaProcesamiento de chatarraResiduos sólidos urbanosConstrucción y demoliciónReciclaje neumáticos OTRReciclaje VFUTodas las soluciones →

// MATRIZ DE COMPARACIÓN

PROPIO vs SUBCONTRATACIÓNMÓVIL vs ESTACIONARIODIÉSEL vs ELÉCTRICOTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Todas las comparaciones →

// CONTACTO

+381644422555
info@arjes-impaktor.rs
BC Usce, Torre 1Bulevar Mihajla Pupina 611070 Belgrado, SerbiaUTC+144.8125 N, 20.4612 E
Logotipo de AXE Machinery
ARJESIMPAKTOR
Aviso legalPolítica de privacidadCondiciones de uso
© 2026 AXE Machinery. Todos los derechos reservados