AXE Machinery Logo
AXE Machinery Logo
MACHINERY//DISTRIBUIDOR
ARJESIMPAKTOR
01Inicio
02MODELOS

// COMPACTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// ESTÁNDAR

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESADO

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESADO

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivo de máquinas

[ 00 ]Todos los modelos//[ 99 ]Biblioteca PDF//
Activo
03NOTICIAS
Solicitar Dossier
AR // CUMPLIMIENTO🇦🇷 ACTIVE

ARIMPAKTOR 350 EVO II

▸ Mandato regulatorio

“Argentina's Industrial Waste Law 25.612, Article 14, provides for fines up to 50,000,000 ARS for non-compliant waste management. Hazardous Waste Law 24.051 applies additional penalties for C&D waste classified as hazardous. Gate fees of 25 EUR/t for mixed waste incentivize on-site processing.”

Acto original:Ley de Gestión de Residuos Industriales 25.612 + Ley de Residuos Peligrosos 24.051Ley 25.612 (Industrial Waste Management) + Ley 24.051 (Hazardous Waste)
★ APROBADO POR EL MINISTERIOactive
IMPAKTOR 350 EVO II — recommended shredder for AR
Potencia
175 kW
Transmisión
diesel
Emisiones
Tier 3
Precio de lista
€170K
Tasa de vertedero
25EUR/t
Residuos C&D mixtos · 7 EUR/t fracción limpia
Ahorro anual estimado
€800K
€800,000 a 40,000 t/año, desvío 80%
OPEX anual (TCO)
€78K
€77,926 · combustible + AdBlue + mantenimiento · 2 000 h/año
Energía / año
€52,052
AdBlue / año
€1,874
Mantenimiento / año
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calculadora ROI // AR
40,000t/año
5,000 t80,000 t

Tasa de vertedero: 25 EUR/t · Desvío: 80%

Ahorro anual estimado
€800,000
25 EUR/t × 40,000 t × 80% desvío
IMPAKTOR 350 EVO II para AR
Ahorro anual estimado€800,000
Base legal

Argentina's Industrial Waste Law 25.612, Article 14, provides for fines up to 50,000,000 ARS for non-compliant waste management. Hazardous Waste Law 24.051 applies additional penalties for C&D waste classified as hazardous. Gate fees of 25 EUR/t for mixed waste incentivize on-site processing.

Acto original:Ley de Gestión de Residuos Industriales 25.612 + Ley de Residuos Peligrosos 24.051Ley 25.612 (Industrial Waste Management) + Ley 24.051 (Hazardous Waste)
ESCUDO_FISCAL // INCENTIVOS· IMPAKTOR 350 EVO II
Mecanismos:accelerated depreciation
✓ 33% AMORT. ACELERADA
Transmisión:dieselEmisiones:Tier 3Combustible:23.66 L/h
← Volver al Hub de cumplimiento
AXE MACHINERY
Distribuidor oficial ARJES — Informe de cumplimiento
24 Aug 2026
AR
ACTIVE

1. Base regulatoria

Acto original: Ley de Gestión de Residuos Industriales 25.612 + Ley de Residuos Peligrosos 24.051
1. Base regulatoria: Argentina's Industrial Waste Law 25.612, Article 14, provides for fines up to 50,000,000 ARS for non-compliant waste management. Hazardous Waste Law 24.051 applies additional penalties for C&D waste classified as hazardous. Gate fees of 25 EUR/t for mixed waste incentivize on-site processing.
Acto regulatorio: Ley 25.612 (Industrial Waste Management) + Ley 24.051 (Hazardous Waste)

2. Análisis de impacto económico

ParámetroValor
RegiónAR
Tasa de vertedero25 EUR/t
Capacidad anual40,000 t/yr
Tasa de desvío80%
Sistema recomendadoIMPAKTOR 350 EVO II
Tipo de transmisiónDIESEL
Norma de emisionesTier 3
Ahorro anual estimado (tasa de vertedero)
€800,000
a 40,000 t/año, desvío 80%
Componente OPEXCosto anual (EUR)
Diésel + AdBlue€52,052(incl. AdBlue €1,874)
Mantenimiento€24,000
Total OPEX anual€77,926
AXE Machinery — Socio de distribución oficial ARJES GmbHarjes-impaktor.rs