AXE Machinery Logosu
AXE Machinery Logosu
MAKİNA//DİSTRİBÜTÖR
ARJESIMPAKTOR
01Ana Sayfa
02MODELLER

// KOMPAKT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDART

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// AĞIR

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SÜPER AĞIR

[ 01 ]1250 D//[ 02 ]1250 E//

// Makine Arşivi

[ 00 ]Tüm modeller//[ 99 ]PDF Kütüphanesi//
Aktif
03ÇÖZÜMLER
04TECH
05UYUMLULUK
Yatırım Raporu
US-FL // UYUMLULUK🇺🇸 ACTIVE

Florida (ABD)ARJES Impaktor 350 EVO II

▸ Mevzuat mandası

“Florida's FDEP Chapter 62-701 (Florida Administrative Code) regulates solid waste management facilities, including specific provisions for C&D waste processing facilities (Section 62-701.730) and disaster debris management. Following major hurricane events (Ian 2022, Idalia 2023, Milton 2024), Florida activates emergency disaster debris management protocols that temporarily relax permitting for C&D processing but require full documentation of diverted tonnage. Tier 4 Final emission standards apply to off-road diesel equipment. Non-compliance penalties range from USD $1,000 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $140/ST, surging to USD $200/ST during active disaster recovery operations.”

Orijinal yasa:Florida Department of Environmental Protection (FDEP) Chapter 62-701 FAC — Solid Waste Resource Management Facilities + Disaster Debris Management RulesFDEP Chapter 62-701 (Solid Waste Facilities) + Disaster Debris Management Rules
Kaynak: Düzenleyici veri kaydıİnceleme gerekli
ARJES Impaktor 350 EVO II — recommended shredder for Florida (ABD)
Güç
175 kW
Aktarma
diesel
Emisyon
Tier 4_Final
Liste fiyatı
€170K
Döküm sahası ücreti
128EUR/t
Karışık C&D atık · 32 EUR/t temiz fraksiyon
Tahmini yıllık tasarruf
€4096K
€4,096,000 40,000 t/yıl, saptırma 80%
Yıllık OPEX (TCO)
€71K
€71,242 · yakıt + AdBlue + bakım · 2 000 sa/yıl
Enerji / yıl
€45,600
AdBlue / yıl
€1,642
Bakım / yıl
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Hesaplayıcı // US-FL
40,000t/yıl
5,000 t80,000 t

Döküm sahası ücreti: 128 EUR/t · Saptırma: 80%

Tahmini yıllık ücret tasarrufu
€4,096,000
128 EUR/t × 40,000 t × 80% saptırma
Florida (ABD) için ARJES Impaktor 350 EVO II
Tahmini yıllık tasarruf€4,096,000
Yasal temel

Florida's FDEP Chapter 62-701 (Florida Administrative Code) regulates solid waste management facilities, including specific provisions for C&D waste processing facilities (Section 62-701.730) and disaster debris management. Following major hurricane events (Ian 2022, Idalia 2023, Milton 2024), Florida activates emergency disaster debris management protocols that temporarily relax permitting for C&D processing but require full documentation of diverted tonnage. Tier 4 Final emission standards apply to off-road diesel equipment. Non-compliance penalties range from USD $1,000 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $140/ST, surging to USD $200/ST during active disaster recovery operations.

Orijinal yasa:Florida Department of Environmental Protection (FDEP) Chapter 62-701 FAC — Solid Waste Resource Management Facilities + Disaster Debris Management RulesFDEP Chapter 62-701 (Solid Waste Facilities) + Disaster Debris Management Rules
MALİ_KALKAN // TEŞVİKLER· ARJES Impaktor 350 EVO II
Mekanizmalar:accelerated depreciationcit deduction
✓ 100% HIZLANDIRILMIŞ AMORTİSMAN
Aktarma:dieselEmisyon:Tier 4_FinalYakıt:24 L/h
← Uyumluluk Hub'ına geri dön
AXE MACHINERY
ARJES Resmi Distribütör — Uyumluluk Raporu
19 Sept 2026
Florida (ABD)
ACTIVE

1. Mevzuat temeli

Orijinal yasa: Florida Department of Environmental Protection (FDEP) Chapter 62-701 FAC — Solid Waste Resource Management Facilities + Disaster Debris Management Rules
1. Mevzuat temeli: Florida's FDEP Chapter 62-701 (Florida Administrative Code) regulates solid waste management facilities, including specific provisions for C&D waste processing facilities (Section 62-701.730) and disaster debris management. Following major hurricane events (Ian 2022, Idalia 2023, Milton 2024), Florida activates emergency disaster debris management protocols that temporarily relax permitting for C&D processing but require full documentation of diverted tonnage. Tier 4 Final emission standards apply to off-road diesel equipment. Non-compliance penalties range from USD $1,000 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $140/ST, surging to USD $200/ST during active disaster recovery operations.
Mevzuat düzenlemesi: FDEP Chapter 62-701 (Solid Waste Facilities) + Disaster Debris Management Rules

2. Ekonomik etki analizi

ParametreDeğer
BölgeFlorida (ABD)
Döküm sahası ücreti128 EUR/t
Yıllık işleme kapasitesi40,000 t/yr
Saptırma oranı80%
Önerilen sistemARJES Impaktor 350 EVO II
Aktarma tipiDIESEL
Emisyon standardıTier 4_Final
Tahmini yıllık döküm sahası ücret tasarrufu
€4,096,000
40,000 t/yıl, saptırma 80%
OPEX bileşeniYıllık maliyet (EUR)
Dizel + AdBlue€45,600(incl. AdBlue €1,642)
Bakım€24,000
Toplam yıllık OPEX€71,242
AXE Machinery — ARJES GmbH Resmi Dağıtım Ortağıarjes-impaktor.rs

// BİLGİ MERKEZİ

Ar-Ge & MühendislikUyumluluk merkeziHABERLERLojistik & Eski donanım

Malzemeye göre endüstriyel çözümler // Operasyonel hub'lar

Beton kırmaAhşap geri dönüşümüHurda metal işlemeBelediye katı atıkİnşaat ve yıkıntı atıklarıOTR lastik geri dönüşümÖmrünü tamamlamış araçlar (ÖTA)Tüm çözümler →

// KARŞILAŞTIRMA MATRİSİ

KENDİ İÇİNDE vs TAŞERONMOBİL vs SABİTDİZEL vs ELEKTRİKTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Tüm karşılaştırmalar →

// İLETİŞİM

+381644422555
info@arjes-impaktor.rs
BC Usce, Kule 1Bulevar Mihajla Pupina 611070 Belgrad, SırbistanUTC+144.8125 N, 20.4612 E
AXE Machinery Logosu
ARJESIMPAKTOR
Yasal BildirimGizlilik PolitikasıKullanım Koşulları
© 2026 AXE Machinery. Tüm hakları saklıdır