AXE Machinery Logosu
AXE Machinery Logosu
MAKİNA//DİSTRİBÜTÖR
ARJESIMPAKTOR
01Ana Sayfa
02MODELLER

// KOMPAKT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDART

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// AĞIR

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SÜPER AĞIR

[ 01 ]1250 D//[ 02 ]1250 E//

// Makine Arşivi

[ 00 ]Tüm modeller//[ 99 ]PDF Kütüphanesi//
Aktif
03ÇÖZÜMLER
04TECH
05UYUMLULUK
Yatırım Raporu
Kanonik — Doğrulanmış Kaynak

Cezalar

GB için 4 kabul edilen ve doğrulanan kanonik iddia

GB-PEN-CANON-001s.33

Unauthorised deposit of waste (fly-tipping) under EPA 1990 s.33 — criminal fine route

Yasa: Environmental Protection Act 1990Coğrafya: England & Wales (NATIONAL_SUBDIVISION)Yaptırım: CRIMINAL FINE
Kaynak: Environmental Protection Act 1990, section 33 (illegal deposit of waste)(PRIMARY_OFFICIAL)

EPA 1990 s.33: unauthorised deposit of controlled waste is an either-way offence; on indictment on conviction the court may impose an unlimited fine.

GB-PEN-CANON-002s.33

Unauthorised deposit of waste (fly-tipping) under EPA 1990 s.33 — criminal imprisonment route

Yasa: Environmental Protection Act 1990Coğrafya: England & Wales (NATIONAL_SUBDIVISION)Yaptırım: CRIMINAL IMPRISONMENT
Kaynak: Environmental Protection Act 1990, section 33 (illegal deposit of waste)(PRIMARY_OFFICIAL)

EPA 1990 s.33: imprisonment for a term not exceeding 5 years (either-way offence on indictment).

GB-PEN-CANON-003reg. 12 + reg. 38

Operating / carrying on a regulated waste operation without the required environmental permit under EPR 2016 reg. 12 + reg. 38 — civil/enforcement penalty route

Yasa: Environmental Permitting (England and Wales) Regulations 2016Coğrafya: England (NATIONAL_SUBDIVISION)Yaptırım: CIVIL PENALTY
Kaynak: Environmental Permitting (England and Wales) Regulations 2016, regs. 12 + 38(PRIMARY_OFFICIAL)

EPR 2016 reg. 12: operating a regulated facility without an environmental permit is an offence. Reg. 38: enforcement provisions including variable monetary penalties.

GB-PEN-CANON-004reg. 38(2)

Failure to comply with an environmental permit condition under EPR 2016 reg. 38(2) — civil/enforcement penalty route

Yasa: Environmental Permitting (England and Wales) Regulations 2016Coğrafya: England (NATIONAL_SUBDIVISION)Yaptırım: CIVIL PENALTY
Kaynak: Environmental Permitting (England and Wales) Regulations 2016, regs. 12 + 38(PRIMARY_OFFICIAL)

EPR 2016 reg. 38(2): breach of permit condition — enforcement provisions including variable monetary penalties and enforcement undertakings.

Kanonik — Doğrulanmış Kaynak

Yol Dışı Makine Emisyonları

GB için 3 kabul edilen ve doğrulanan kanonik iddia

GB-NRMM-CANON-001Whole instrument; SCHEDULE 1 (Offences, penalties, enforcement and other matters) PART 1 Offences; PART 2 Penalties (Criminal penalties + Civil penalties); PART 3 Enforcement and other matters

United Kingdom has a binding national statutory instrument regulating non-road mobile machinery emissions: SI 2018/764 The Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutants) Regulations 2018, made 25 June 2018, laid before Parliament 28 June 2018, coming into force 21 September 2018, made by the Secretary of State for Transport under European Communities Act 1972 s.2(2) and Schedule 2 para 1A, implementing Regulation (EU) 2016/1628 ('the NRMM Regulation') in UK law with type-approval, market surveillance, offences, criminal penalties, civil penalties, and enforcement provisions

Yasa: The Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutants) Regulations 2018 (SI 2018/764)Coğrafya: United Kingdom (national) (NATIONAL)
Kaynak: The Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutants) Regulations 2018 (SI 2018/764)(PRIMARY_OFFICIAL)

legislation.gov.uk/uksi/2018/764 — 'The Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutants) Regulations 2018 — Made 25 Jun 2018, in force 21 Sep 2018, Secretary of State for Transport; makes provision in connection with EU Regulation 2016/1628 (NRMM Regulation) and provides for offences punishable by criminal or civil penalties.'

GB-NRMM-CANON-002gov.uk guidance 'Non-road mobile machinery: rules on type approval and engine markings' §1 Type approval rules; §2 Report a manufacturer or seller to DVSA

New non-road mobile machinery sold in the UK must have a type-approved engine and engine markings proving it has the correct type approval; type approval proves the engine meets the latest emissions standards; applies to England, Scotland and Wales; DVSA enforces and accepts reports of manufacturers/sellers breaching type-approval rules

Yasa: Statutory guidance under SI 2018/764 (Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutants) Regulations 2018)Coğrafya: United Kingdom — England, Scotland and Wales (gov.uk explicit 'Applies to' field) (NATIONAL_SUBDIVISION)
Kaynak: Non-road mobile machinery: rules on type approval and engine markings(PRIMARY_OFFICIAL)

gov.uk (HTTP 200, published 11 May 2023, applies to England, Scotland and Wales) — 'New non-road mobile machinery sold in the UK must: have a type-approved engine; have markings displayed on the engine to prove it has the right type approval. Type approval proves that the engine meets the latest emissions standards.'

GB-NRMM-CANON-003VCA guidance 'Type Approval for Non-Road Mobile Machinery (NRMM)' — section 'Approval requirements engines for non-road mobile machinery' and 'Provisional GB Type Approval'

Engines for use in non-road mobile machinery (NRMM) sold in the UK must have type-approval to Stage V (unless covered by Transition Engines provisions); from 1 January 2023, NRMM engines must hold Provisional GB type approval (based on valid EU or UNECE R96 type approval) to be placed on the market in Great Britain; this is the post-Brexit GB national approval scheme continuing EU Regulation 2016/1628 standards

Yasa: Provisional GB Type Approval scheme (post-Brexit continuation of EU Regulation 2016/1628 Stage V requirements) under SI 2018/764Coğrafya: Great Britain (post-Brexit Provisional GB Type Approval from 1 January 2023) (NATIONAL)
Kaynak: Type Approval for Non-Road Mobile Machinery (NRMM)(PRIMARY_OFFICIAL)

VCA page (HTTP 200, last updated 17 Jan 2024) — 'From 1st January 2023, non-road mobile machinery engines must hold Provisional GB type approval in order to be placed on the market in Great Britain. This approval is based on the engine type concerned holding either a valid EU or UNECE R96 type approval.'

Kanonik — Doğrulanmış Kaynak

Sıfır Emisyon

GB için 2 kabul edilen ve doğrulanan kanonik iddia

GB-ZERO-CANON-001SI 2019/1056 Article 2(1) and 2(2): 'In subsection (1), for "80%" substitute "100%"'; amended Climate Change Act 2008 s.1(1)

United Kingdom has a legally binding national net-zero greenhouse gas emissions target for 2050: net UK carbon account for 2050 must be at least 100% lower than the 1990 baseline (amended from prior 80% target by SI 2019/1056, made 26 June 2019, in force from day after making). This is a TARGET on the national carbon account, NOT an equipment-level zero-emission mandate for non-road mobile machinery or construction equipment.

Yasa: Climate Change Act 2008 (c. 27) s.1(1) as amended by The Climate Change Act 2008 (2050 Target Amendment) Order 2019 (SI 2019/1056)Coğrafya: United Kingdom (national — net UK carbon account) (NATIONAL)Sınıflandırma: Politika Hedefi
Kaynak: The Climate Change Act 2008 (2050 Target Amendment) Order 2019 (SI 2019/1056)(PRIMARY_OFFICIAL)

legislation.gov.uk/uksi/2019/1056 — 'The Climate Change Act 2008 (2050 Target Amendment) Order 2019 — Made 26 Jun 2019; Article 2 amends section 1(1) of the Climate Change Act 2008 by substituting 100% for 80%, so the net UK carbon account for 2050 must be at least 100% lower than the 1990 baseline.'

GB-ZERO-CANON-002PPN 06/21 whole note — requirement applies to in-scope procurement above £5m threshold for central government contracts

UK central government procurement (contracts above £5 million threshold, including major government construction works) requires suppliers to provide a Carbon Reduction Plan (CRP) committing the supplier to achieve Net Zero by 2050 in the UK. This is a procurement policy requirement on suppliers' corporate carbon plans, NOT an equipment-level zero-emission mandate for non-road mobile machinery or construction equipment supplied.

Yasa: Procurement Policy Note 06/21 (PPN 06/21) — Taking account of Carbon Reduction Plans in the procurement of major government contractsCoğrafya: United Kingdom — central government procurement (England, Scotland, Wales, Northern Ireland) (NATIONAL_SUBDIVISION)Sınıflandırma: Satınalma GereksinimiKapsam: Yalnızca Kamu Satınalaması
Kaynak: Procurement Policy Note 06/21: Taking account of Carbon Reduction Plans in the procurement of major government contracts(PRIMARY_OFFICIAL)

gov.uk — 'Procurement Policy Note 06/21: Taking account of Carbon Reduction Plans in the procurement of major government contracts' — Government Commercial Function, published 5 June 2021, last updated 17 April 2023.

GB // UYUMLULUK🇬🇧 ACTIVE

Birleşik KrallıkARJES Impaktor 1100

▸ Mevzuat mandası

“The UK's landfill tax is the highest in Europe: standard rate £126.15/t (2025/26), rising to £130.75/t (2026/27). C&D waste accounts for approximately 40% of all UK landfill. The EPA 1990 imposes a duty of care on waste producers, with unlimited fines for offences. The Waste Regulations 2011 (SI 2011/988) mandate separate collection of waste streams and application of the waste hierarchy. From March 2025, all businesses in England must separately collect recyclable materials. The 70% C&D waste recovery target is consistently exceeded. Current gate fee of €150/t for mixed waste makes on-site processing the most economically compelling option in Europe.”

Orijinal yasa:Environmental Protection Act 1990 & Waste (England and Wales) Regulations 2011 (SI 2011/988)Environmental Protection Act 1990 & Waste (England and Wales) Regulations 2011 (SI 2011/988)
Kaynak: Düzenleyici veri kaydıİnceleme gerekli
ARJES Impaktor 1100 — recommended shredder for Birleşik Krallık
Güç
585 kW
Aktarma
diesel
Emisyon
Stage V
Liste fiyatı
€479K
Döküm sahası ücreti
150EUR/t
Karışık C&D atık · 4 EUR/t temiz fraksiyon
Tahmini yıllık tasarruf
€4800K
€4,800,000 40,000 t/yıl, saptırma 80%
Yıllık OPEX (TCO)
€111K
€111,024 · yakıt + AdBlue + bakım · 2 000 sa/yıl
Enerji / yıl
€84,000
AdBlue / yıl
€3,024
Bakım / yıl
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Hesaplayıcı // GB
40,000t/yıl
5,000 t80,000 t

Döküm sahası ücreti: 150 EUR/t · Saptırma: 80%

Tahmini yıllık ücret tasarrufu
€4,800,000
150 EUR/t × 40,000 t × 80% saptırma
Birleşik Krallık için ARJES Impaktor 1100
Tahmini yıllık tasarruf€4,800,000
Yasal temel

The UK's landfill tax is the highest in Europe: standard rate £126.15/t (2025/26), rising to £130.75/t (2026/27). C&D waste accounts for approximately 40% of all UK landfill. The EPA 1990 imposes a duty of care on waste producers, with unlimited fines for offences. The Waste Regulations 2011 (SI 2011/988) mandate separate collection of waste streams and application of the waste hierarchy. From March 2025, all businesses in England must separately collect recyclable materials. The 70% C&D waste recovery target is consistently exceeded. Current gate fee of €150/t for mixed waste makes on-site processing the most economically compelling option in Europe.

Orijinal yasa:Environmental Protection Act 1990 & Waste (England and Wales) Regulations 2011 (SI 2011/988)Environmental Protection Act 1990 & Waste (England and Wales) Regulations 2011 (SI 2011/988)
MALİ_KALKAN // TEŞVİKLER· ARJES Impaktor 1100
Mekanizmalar:vat exemptionaccelerated depreciationamortization shield
✓ KDV MUAF✓ 40% HIZLANDIRILMIŞ AMORTİSMAN
Aktarma:dieselEmisyon:Stage VYakıt:24 L/h
← Uyumluluk Hub'ına geri dön
AXE MACHINERY
ARJES Resmi Distribütör — Uyumluluk Raporu
15 Sept 2026
Birleşik Krallık
ACTIVE

1. Mevzuat temeli

Orijinal yasa: Environmental Protection Act 1990 & Waste (England and Wales) Regulations 2011 (SI 2011/988)
1. Mevzuat temeli: The UK's landfill tax is the highest in Europe: standard rate £126.15/t (2025/26), rising to £130.75/t (2026/27). C&D waste accounts for approximately 40% of all UK landfill. The EPA 1990 imposes a duty of care on waste producers, with unlimited fines for offences. The Waste Regulations 2011 (SI 2011/988) mandate separate collection of waste streams and application of the waste hierarchy. From March 2025, all businesses in England must separately collect recyclable materials. The 70% C&D waste recovery target is consistently exceeded. Current gate fee of €150/t for mixed waste makes on-site processing the most economically compelling option in Europe.
Mevzuat düzenlemesi: Environmental Protection Act 1990 & Waste (England and Wales) Regulations 2011 (SI 2011/988)

2. Ekonomik etki analizi

ParametreDeğer
BölgeBirleşik Krallık
Döküm sahası ücreti150 EUR/t
Yıllık işleme kapasitesi40,000 t/yr
Saptırma oranı80%
Önerilen sistemARJES Impaktor 1100
Aktarma tipiDIESEL
Emisyon standardıStage V
Tahmini yıllık döküm sahası ücret tasarrufu
€4,800,000
40,000 t/yıl, saptırma 80%
OPEX bileşeniYıllık maliyet (EUR)
Dizel + AdBlue€84,000(incl. AdBlue €3,024)
Bakım€24,000
Toplam yıllık OPEX€111,024
AXE Machinery — ARJES GmbH Resmi Dağıtım Ortağıarjes-impaktor.rs

// BİLGİ MERKEZİ

Ar-Ge & MühendislikUyumluluk merkeziHABERLERLojistik & Eski donanım

Malzemeye göre endüstriyel çözümler // Operasyonel hub'lar

Beton kırmaAhşap geri dönüşümüHurda metal işlemeBelediye katı atıkİnşaat ve yıkıntı atıklarıOTR lastik geri dönüşümÖmrünü tamamlamış araçlar (ÖTA)Tüm çözümler →

// KARŞILAŞTIRMA MATRİSİ

KENDİ İÇİNDE vs TAŞERONMOBİL vs SABİTDİZEL vs ELEKTRİKTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Tüm karşılaştırmalar →

// İLETİŞİM

+381644422555
info@arjes-impaktor.rs
BC Usce, Kule 1Bulevar Mihajla Pupina 611070 Belgrad, SırbistanUTC+144.8125 N, 20.4612 E
AXE Machinery Logosu
ARJESIMPAKTOR
Yasal BildirimGizlilik PolitikasıKullanım Koşulları
© 2026 AXE Machinery. Tüm hakları saklıdır