▸ Mevzuat mandası“Federal Law No. 12 of 2018 on Integrated Waste Management mandates all construction facilities to sort waste on-site. Article 15 provides for fines of up to AED 100,000 per tonne of mixed waste disposed at landfills.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Döküm sahası ücreti: 25 EUR/t · Saptırma: 80%
Federal Law No. 12 of 2018 on Integrated Waste Management mandates all construction facilities to sort waste on-site. Article 15 provides for fines of up to AED 100,000 per tonne of mixed waste disposed at landfills.
| Parametre | Değer |
|---|---|
| Bölge | Birleşik Arap Emirlikleri |
| Döküm sahası ücreti | 25 EUR/t |
| Yıllık işleme kapasitesi | 40,000 t/yr |
| Saptırma oranı | 80% |
| Önerilen sistem | ARJES Impaktor 1100 |
| Aktarma tipi | DIESEL |
| Emisyon standardı | Tier 3 |
| OPEX bileşeni | Yıllık maliyet (EUR) |
|---|---|
| Dizel + AdBlue | €45,000(incl. AdBlue €1,620) |
| Bakım | €24,000 |
| Toplam yıllık OPEX | €70,620 |