▸ Mevzuat mandası“Vision 2030 NTP directly bans unsorted reinforced concrete disposal at Riyadh and Jeddah landfills. EUR 64/t gate fee creates the strongest MENA penalty arbitrage. OTR tire processing capability required for mining sector integration.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Döküm sahası ücreti: 64 EUR/t · Saptırma: 80%
Vision 2030 NTP directly bans unsorted reinforced concrete disposal at Riyadh and Jeddah landfills. EUR 64/t gate fee creates the strongest MENA penalty arbitrage. OTR tire processing capability required for mining sector integration.
| Parametre | Değer |
|---|---|
| Bölge | Suudi Arabistan |
| Döküm sahası ücreti | 64 EUR/t |
| Yıllık işleme kapasitesi | 40,000 t/yr |
| Saptırma oranı | 80% |
| Önerilen sistem | IMPAKTOR 1100 |
| Aktarma tipi | DIESEL |
| Emisyon standardı | Tier 3 |
| OPEX bileşeni | Yıllık maliyet (EUR) |
|---|---|
| Dizel + AdBlue | €27,300(incl. AdBlue €983) |
| Bakım | €24,000 |
| Toplam yıllık OPEX | €52,283 |