▸ Mevzuat mandası“GEO 92/2021 establishes a 70% C&D waste recycling target for 2026, with EUR 32/t gate fee and 30% first-year accelerated depreciation. Article 17 requires waste management plans for all construction projects exceeding 500 m².”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Döküm sahası ücreti: 32 EUR/t · Saptırma: 80%
GEO 92/2021 establishes a 70% C&D waste recycling target for 2026, with EUR 32/t gate fee and 30% first-year accelerated depreciation. Article 17 requires waste management plans for all construction projects exceeding 500 m².
| Parametre | Değer |
|---|---|
| Bölge | Romanya |
| Döküm sahası ücreti | 32 EUR/t |
| Yıllık işleme kapasitesi | 40,000 t/yr |
| Saptırma oranı | 80% |
| Önerilen sistem | ARJES Impaktor 350 EVO II |
| Aktarma tipi | DIESEL |
| Emisyon standardı | Stage V |
| OPEX bileşeni | Yıllık maliyet (EUR) |
|---|---|
| Dizel + AdBlue | €71,926(incl. AdBlue €2,589) |
| Bakım | €24,000 |
| Toplam yıllık OPEX | €98,516 |