▸ Mevzuat mandası“Poland's Waste Act (Ustawa o odpadach z dnia 14 grudnia 2012 r., published Dz.U. 2013 poz. 21) governs waste management including construction and demolition waste. The penalty provision is not yet verified: Art. 82 concerns the BDO (waste database) electronic register, not penalties, and the actual penalty article requires identification from the ISAP consolidated text. The enforcement authority is not identified. No national statutory gate fee exists — gate fees are commercial/market-based and are not published in canonical data. EU Landfill Directive 1999/31/EC applies.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Çöp kabul ücreti ön ayarı kullanılamıyor — veri eksik.
Poland's Waste Act (Ustawa o odpadach z dnia 14 grudnia 2012 r., published Dz.U. 2013 poz. 21) governs waste management including construction and demolition waste. The penalty provision is not yet verified: Art. 82 concerns the BDO (waste database) electronic register, not penalties, and the actual penalty article requires identification from the ISAP consolidated text. The enforcement authority is not identified. No national statutory gate fee exists — gate fees are commercial/market-based and are not published in canonical data. EU Landfill Directive 1999/31/EC applies.
| Parametre | Değer |
|---|---|
| Bölge | Polonya |
| Döküm sahası ücreti | — |
| Yıllık işleme kapasitesi | 40,000 t/yr |
| Saptırma oranı | 80% |
| Önerilen sistem | IMPAKTOR 1100 |
| Aktarma tipi | DIESEL |
| Emisyon standardı | Stage V |
| OPEX bileşeni | Yıllık maliyet (EUR) |
|---|---|
| Dizel + AdBlue | €73,346(incl. AdBlue €2,640) |
| Bakım | €24,000 |
| Toplam yıllık OPEX | €99,986 |