▸ Mevzuat mandası“Waste Management Act (Official Gazette of North Macedonia, No. 67/2024, rev. 2026) mandates on-site separation of construction waste. Article 22 stipulates that buildings cannot receive a Usage Permit without confirmation of proper waste handling.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Döküm sahası ücreti: 12 EUR/t · Saptırma: 80%
Waste Management Act (Official Gazette of North Macedonia, No. 67/2024, rev. 2026) mandates on-site separation of construction waste. Article 22 stipulates that buildings cannot receive a Usage Permit without confirmation of proper waste handling.
| Parametre | Değer |
|---|---|
| Bölge | Kuzey Makedonya |
| Döküm sahası ücreti | 12 EUR/t |
| Yıllık işleme kapasitesi | 40,000 t/yr |
| Saptırma oranı | 80% |
| Önerilen sistem | ARJES Impaktor 250 EVO II |
| Aktarma tipi | DIESEL |
| Emisyon standardı | Stage V |
| OPEX bileşeni | Yıllık maliyet (EUR) |
|---|---|
| Dizel + AdBlue | €52,200(incl. AdBlue €1,879) |
| Bakım | €24,000 |
| Toplam yıllık OPEX | €78,079 |