▸ Mevzuat mandası“NESREA Act 2007, reinforced by 2024 National Environmental Regulations, mandates 50% C&D waste recovery in Lagos. Low current levy of $5/t creates an early-entry opportunity as enforcement capacity expands. NESREA can impose facility shutdown and NGN 1–5M fines.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Döküm sahası ücreti: 8 EUR/t · Saptırma: 80%
NESREA Act 2007, reinforced by 2024 National Environmental Regulations, mandates 50% C&D waste recovery in Lagos. Low current levy of $5/t creates an early-entry opportunity as enforcement capacity expands. NESREA can impose facility shutdown and NGN 1–5M fines.
| Parametre | Değer |
|---|---|
| Bölge | Nijerya |
| Döküm sahası ücreti | 8 EUR/t |
| Yıllık işleme kapasitesi | 40,000 t/yr |
| Saptırma oranı | 80% |
| Önerilen sistem | ARJES Impaktor 250 EVO II |
| Aktarma tipi | DIESEL |
| Emisyon standardı | Tier 3 |
| OPEX bileşeni | Yıllık maliyet (EUR) |
|---|---|
| Dizel + AdBlue | €34,440(incl. AdBlue €1,033) |
| Bakım | €24,000 |
| Toplam yıllık OPEX | €59,473 |