AXE Machinery Logosu
AXE Machinery Logosu
MAKİNA//DİSTRİBÜTÖR
ARJESIMPAKTOR
01Ana Sayfa
02MODELLER

// KOMPAKT

[ 01 ]250 EVO II//[ 02 ]250 E EVO II//

// STANDART

[ 01 ]350 EVO II//[ 02 ]350 E EVO II//

// AĞIR

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SÜPER AĞIR

[ 01 ]1250 D//[ 02 ]1250 E//

// Makine Arşivi

[ 00 ]Tüm modeller//[ 99 ]PDF Kütüphanesi//
Aktif
03ÇÖZÜMLER
04TECH
05UYUMLULUK
Yatırım Raporu
CN // UYUMLULUK🇨🇳 ACTIVE

Çin (Tier 1 merkezleri) — ARJES Impaktor 350 EVO II

▸ Mevzuat mandası

“The PRC Ecological and Environmental Code (adopted 2026-03-12, effective 2026-08-15) is the current primary environmental statute for the People’s Republic of China. It supersedes and incorporates the prior Environmental Protection Law of the PRC (2014 revision) and the Solid Waste Pollution Prevention and Control Law (2020 revision), which are retained only as HISTORICAL / SOURCE_LINEAGE (SUPERSEDED). Under the 2026 Code, illegal dumping or disposal of construction waste attracts administrative penalties of ¥100,000 to ¥1,000,000 per offence (Art. 1169), with per-day continuous accumulation (Art. 1060) and double-penalty escalation for officers (Art. 1064). Municipalities such as Shanghai and Beijing impose additional local C&D waste recycling mandates with per-tonne surcharges.”

Orijinal yasa:《中华人民共和国生态环境法典》(2026年)PRC Ecological and Environmental Code (2026, effective 2026-08-15)
Kaynak: Düzenleyici veri kaydıİnceleme gerekli
ARJES Impaktor 350 EVO II — recommended shredder for Çin (Tier 1 merkezleri)
Güç
175 kW
Aktarma
diesel
Emisyon
China VI
Liste fiyatı
€170K
Döküm sahası ücreti
15EUR/t
Karışık C&D atık · 5 EUR/t temiz fraksiyon
Tahmini yıllık tasarruf
€480K
€480,000 40,000 t/yıl, saptırma 80%
Yıllık OPEX (TCO)
€67K
€67,305 · yakıt + AdBlue + bakım · 2 000 sa/yıl
Enerji / yıl
€41,800
AdBlue / yıl
€1,505
Bakım / yıl
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Hesaplayıcı // CN
40,000t/yıl
5,000 t80,000 t

Döküm sahası ücreti: 15 EUR/t · Saptırma: 80%

Tahmini yıllık ücret tasarrufu
€480,000
15 EUR/t × 40,000 t × 80% saptırma
Çin (Tier 1 merkezleri) için ARJES Impaktor 350 EVO II
Tahmini yıllık tasarruf€480,000
Yasal temel

The PRC Ecological and Environmental Code (adopted 2026-03-12, effective 2026-08-15) is the current primary environmental statute for the People’s Republic of China. It supersedes and incorporates the prior Environmental Protection Law of the PRC (2014 revision) and the Solid Waste Pollution Prevention and Control Law (2020 revision), which are retained only as HISTORICAL / SOURCE_LINEAGE (SUPERSEDED). Under the 2026 Code, illegal dumping or disposal of construction waste attracts administrative penalties of ¥100,000 to ¥1,000,000 per offence (Art. 1169), with per-day continuous accumulation (Art. 1060) and double-penalty escalation for officers (Art. 1064). Municipalities such as Shanghai and Beijing impose additional local C&D waste recycling mandates with per-tonne surcharges.

Orijinal yasa:《中华人民共和国生态环境法典》(2026年)PRC Ecological and Environmental Code (2026, effective 2026-08-15)
MALİ_KALKAN // TEŞVİKLER· ARJES Impaktor 350 EVO II
Mekanizmalar:accelerated depreciationsubsidized rate
✓ 100% HIZLANDIRILMIŞ AMORTİSMAN
Aktarma:dieselEmisyon:—Yakıt:0 L/h
← Uyumluluk Hub'ına geri dön
AXE MACHINERY
ARJES Resmi Distribütör — Uyumluluk Raporu
23 Oct 2026
Çin (Tier 1 merkezleri)
ACTIVE

1. Mevzuat temeli

Orijinal yasa: 《中华人民共和国生态环境法典》(2026年)
1. Mevzuat temeli: The PRC Ecological and Environmental Code (adopted 2026-03-12, effective 2026-08-15) is the current primary environmental statute for the People’s Republic of China. It supersedes and incorporates the prior Environmental Protection Law of the PRC (2014 revision) and the Solid Waste Pollution Prevention and Control Law (2020 revision), which are retained only as HISTORICAL / SOURCE_LINEAGE (SUPERSEDED). Under the 2026 Code, illegal dumping or disposal of construction waste attracts administrative penalties of ¥100,000 to ¥1,000,000 per offence (Art. 1169), with per-day continuous accumulation (Art. 1060) and double-penalty escalation for officers (Art. 1064). Municipalities such as Shanghai and Beijing impose additional local C&D waste recycling mandates with per-tonne surcharges.
Mevzuat düzenlemesi: PRC Ecological and Environmental Code (2026, effective 2026-08-15)

2. Ekonomik etki analizi

ParametreDeğer
BölgeÇin (Tier 1 merkezleri)
Döküm sahası ücreti15 EUR/t
Yıllık işleme kapasitesi40,000 t/yr
Saptırma oranı80%
Önerilen sistemARJES Impaktor 350 EVO II
Aktarma tipiDIESEL
Emisyon standardı—
Tahmini yıllık döküm sahası ücret tasarrufu
€480,000
40,000 t/yıl, saptırma 80%
OPEX bileşeniYıllık maliyet (EUR)
Dizel + AdBlue€41,800(incl. AdBlue €1,505)
Bakım€24,000
Toplam yıllık OPEX€67,305
AXE Machinery — ARJES GmbH Resmi Dağıtım Ortağıarjes-impaktor.rs

// BİLGİ MERKEZİ

Ar-Ge & MühendislikUyumluluk merkeziHABERLERLojistik & Eski donanım

Malzemeye göre endüstriyel çözümler // Operasyonel hub'lar

Beton kırmaAhşap geri dönüşümüHurda metal işlemeBelediye katı atıkİnşaat ve yıkıntı atıklarıOTR lastik geri dönüşümÖmrünü tamamlamış araçlar (ÖTA)Tüm çözümler →

// KARŞILAŞTIRMA MATRİSİ

KENDİ İÇİNDE vs TAŞERONMOBİL vs SABİTDİZEL vs ELEKTRİKTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Tüm karşılaştırmalar →

// İLETİŞİM

+381644422555
info@arjes-impaktor.rs
BC Usce, Kule 1Bulevar Mihajla Pupina 611070 Belgrad, SırbistanUTC+144.8125 N, 20.4612 E
AXE Machinery Logosu
ARJESIMPAKTOR
Yasal BildirimGizlilik PolitikasıKullanım Koşulları
© 2026 AXE Machinery. Tüm hakları saklıdır