▸ Mevzuat mandası“Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
Döküm sahası ücreti: 55 EUR/t · Saptırma: 80%
Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.
| Parametre | Değer |
|---|---|
| Bölge | Brezilya |
| Döküm sahası ücreti | 55 EUR/t |
| Yıllık işleme kapasitesi | 40,000 t/yr |
| Saptırma oranı | 80% |
| Önerilen sistem | IMPAKTOR 350 EVO II |
| Aktarma tipi | DIESEL |
| Emisyon standardı | Tier 4_Final |
| OPEX bileşeni | Yıllık maliyet (EUR) |
|---|---|
| Dizel + AdBlue | €46,200(incl. AdBlue €1,663) |
| Bakım | €24,000 |
| Toplam yıllık OPEX | €71,863 |