AXE Machinery Logosu
AXE Machinery Logosu
MAKİNA//DİSTRİBÜTÖR
ARJESIMPAKTOR
01Ana Sayfa
02MODELLER

// KOMPAKT

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDART

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// AĞIR

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SÜPER AĞIR

[ 01 ]1250 D//[ 02 ]1250 E//

// Makine Arşivi

[ 00 ]Tüm modeller//[ 99 ]PDF Kütüphanesi//
Aktif
03ÇÖZÜMLER
04TECH
05UYUMLULUK
Yatırım Raporu
BR // UYUMLULUK🇧🇷 ACTIVE

BrezilyaIMPAKTOR 350 EVO II

▸ Mevzuat mandası

“Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.”

Orijinal yasa:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
Kaynak: Düzenleyici veri kaydıİnceleme gerekli
IMPAKTOR 350 EVO II — recommended shredder for Brezilya
Güç
175 kW
Aktarma
diesel
Emisyon
Tier 4_Final
Liste fiyatı
€170K
Döküm sahası ücreti
55EUR/t
Karışık C&D atık · 15 EUR/t temiz fraksiyon
Tahmini yıllık tasarruf
€1760K
€1,760,000 40,000 t/yıl, saptırma 80%
Yıllık OPEX (TCO)
€72K
€71,863 · yakıt + AdBlue + bakım · 2 000 sa/yıl
Enerji / yıl
€46,200
AdBlue / yıl
€1,663
Bakım / yıl
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

ROI Hesaplayıcı // BR
40,000t/yıl
5,000 t80,000 t

Döküm sahası ücreti: 55 EUR/t · Saptırma: 80%

Tahmini yıllık ücret tasarrufu
€1,760,000
55 EUR/t × 40,000 t × 80% saptırma
Brezilya için IMPAKTOR 350 EVO II
Tahmini yıllık tasarruf€1,760,000
Yasal temel

Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.

Orijinal yasa:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
MALİ_KALKAN // TEŞVİKLER· IMPAKTOR 350 EVO II
Mekanizmalar:accelerated depreciationcit deduction
✓ 20% HIZLANDIRILMIŞ AMORTİSMAN
Aktarma:dieselEmisyon:Tier 4_FinalYakıt:22 L/h
← Uyumluluk Hub'ına geri dön
AXE MACHINERY
ARJES Resmi Distribütör — Uyumluluk Raporu
19 Sept 2026
Brezilya
ACTIVE

1. Mevzuat temeli

Orijinal yasa: Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002
1. Mevzuat temeli: Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.
Mevzuat düzenlemesi: Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002

2. Ekonomik etki analizi

ParametreDeğer
BölgeBrezilya
Döküm sahası ücreti55 EUR/t
Yıllık işleme kapasitesi40,000 t/yr
Saptırma oranı80%
Önerilen sistemIMPAKTOR 350 EVO II
Aktarma tipiDIESEL
Emisyon standardıTier 4_Final
Tahmini yıllık döküm sahası ücret tasarrufu
€1,760,000
40,000 t/yıl, saptırma 80%
OPEX bileşeniYıllık maliyet (EUR)
Dizel + AdBlue€46,200(incl. AdBlue €1,663)
Bakım€24,000
Toplam yıllık OPEX€71,863
AXE Machinery — ARJES GmbH Resmi Dağıtım Ortağıarjes-impaktor.rs

// BİLGİ MERKEZİ

Ar-Ge & MühendislikUyumluluk merkeziHABERLERLojistik & Eski donanım

Malzemeye göre endüstriyel çözümler // Operasyonel hub'lar

Beton kırmaAhşap geri dönüşümüHurda metal işlemeBelediye katı atıkİnşaat ve yıkıntı atıklarıOTR lastik geri dönüşümÖmrünü tamamlamış araçlar (ÖTA)Tüm çözümler →

// KARŞILAŞTIRMA MATRİSİ

KENDİ İÇİNDE vs TAŞERONMOBİL vs SABİTDİZEL vs ELEKTRİKTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Tüm karşılaştırmalar →

// İLETİŞİM

+381644422555
info@arjes-impaktor.rs
BC Usce, Kule 1Bulevar Mihajla Pupina 611070 Belgrad, SırbistanUTC+144.8125 N, 20.4612 E
AXE Machinery Logosu
ARJESIMPAKTOR
Yasal BildirimGizlilik PolitikasıKullanım Koşulları
© 2026 AXE Machinery. Tüm hakları saklıdır