AXE Machinery
AXE Machinery
آلات//موزع
ARJESIMPAKTOR
01الرئيسية
02الموديلات

// مدمج

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// قياسي

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// ثقيل

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// فائق الثقل

[ 01 ]1250 D//[ 02 ]1250 E//

// أرشيف الآلات

[ 00 ]جميع الموديلات//[ 99 ]مكتبة PDF//
نشط
03الحلول
04TECH
05الامتثال
طلب
US-TX // الامتثال🇺🇸 ACTIVE

تكساس (USA)ARJES Impaktor 350 EVO II

▸ التفويض التنظيمي

“Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).”

النص الأصلي:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
المصدر: سجل البيانات التنظيميةتتطلب مراجعة
ARJES Impaktor 350 EVO II — recommended shredder for تكساس (USA)
القدرة
175 kW
الناقل للحركة
diesel
الانبعاثات
Tier 4_Final
السعر
€170K
رسوم المكب
110EUR/t
نفايات البناء والهدم المختلطة · 28 EUR/t الكسر النظيف
الوفورات السنوية المقدرة
€3520K
€3,520,000 بمعدل 40,000 ط/سنة، تحويل 80%
OPEX السنوية (TCO)
€66K
€66,269 · وقود + AdBlue + صيانة · 2,000 ساعة/سنة
الطاقة / سنة
€40,800
AdBlue / سنة
€1,469
الصيانة / سنة
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

حاسبة العائد على الاستثمار // US-TX
40,000ط/سنة
5,000 ط80,000 ط

رسوم المكب المسبقة: 110 EUR/t · معدل التحويل: 80%

الوفورات السنوية المقدرة للرسوم
€3,520,000
110 EUR/t × 40,000 ط × 80% تحويل
ARJES Impaktor 350 EVO II لـ تكساس (USA)
الوفورات السنوية المقدرة€3,520,000
الأساس القانوني

Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).

النص الأصلي:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
الحماية_المالية // الحوافز· ARJES Impaktor 350 EVO II
الآليات:accelerated depreciationcit deduction
✓ 100% إهلاك مسارع
الناقل:dieselالانبعاثات:Tier 4_Finalالوقود:24 L/h
← العودة إلى مركز الامتثال
AXE MACHINERY
موزع ARJES الرسمي — تقرير الامتثال
19 Sept 2026
تكساس (USA)
ACTIVE

1. الأساس التنظيمي

النص الأصلي: Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration Program
1. الأساس التنظيمي: Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).
التنظيم التشريعي: TCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration

2. تحليل التأثير الاقتصادي

المعاملالقيمة
المنطقةتكساس (USA)
رسوم المكب110 EUR/t
الإنتاجية السنوية40,000 t/yr
معدل التحويل عن المكب80%
النظام الموصى بهARJES Impaktor 350 EVO II
نوع الناقلDIESEL
معيار الانبعاثاتTier 4_Final
الوفورات السنوية المقدرة لرسوم المكب
€3,520,000
بمعدل 40,000 ط/سنة، تحويل 80%
مكون OPEXالتكلفة السنوية (EUR)
ديزل + AdBlue€40,800(incl. AdBlue €1,469)
الصيانة€24,000
إجمالي OPEX السنوية€66,269
AXE Machinery — الشريك الرسمي لـ ARJES GmbHarjes-impaktor.rs

// مركز المعلومات

البحث والهندسةمركز الامتثالالأخباراللوجستيات والمعدات القديمة

حلول صناعية حسب المواد // مراكز تشغيلية

سحق الخرسانةإعادة تدوير الأخشابمعالجة الخردة المعدنيةالنفايات البلدية الصلبةهدم المبانيإعادة تدوير إطارات OTRإعادة تدوير المركباتكل الحلول ←

// مصفوفة المقارنة

داخلي vs تعاقد خارجيمتنقل vs ثابتديزل vs كهربائيTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000كل المقارنات ←

// تواصل معنا

+381644422555
info@arjes-impaktor.rs
برج أوشتشي 1شارع ميهايلو بوبينا 611070 بلغراد، صربياUTC+144.8125 N, 20.4612 E
AXE Machinery
ARJESIMPAKTOR
المعلومات القانونيةسياسة الخصوصيةشروط الاستخدام
© 2026 AXE Machinery. جميع الحقوق محفوظة