▸ التفويض التنظيمي“Colombia's Resolution 1257/2021 (issued by the Ministry of Environment and Sustainable Development) regulates the management of construction and demolition (RCD — Residuos de Construcción y Demolición) waste, mandating that generators prepare waste management plans for projects exceeding 50 m³ of excavated or demolished material. Law 2232 of 2022 extends Extended Producer Responsibility (EPR) to construction materials, requiring manufacturers to fund take-back and recycling programs. The current mixed C&D gate fee at licensed landfills is approximately USD $38/t, with Bogotá, Medellín, and Cali enforcing the strictest diversion mandates.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
رسوم المكب المسبقة: 38 EUR/t · معدل التحويل: 80%
Colombia's Resolution 1257/2021 (issued by the Ministry of Environment and Sustainable Development) regulates the management of construction and demolition (RCD — Residuos de Construcción y Demolición) waste, mandating that generators prepare waste management plans for projects exceeding 50 m³ of excavated or demolished material. Law 2232 of 2022 extends Extended Producer Responsibility (EPR) to construction materials, requiring manufacturers to fund take-back and recycling programs. The current mixed C&D gate fee at licensed landfills is approximately USD $38/t, with Bogotá, Medellín, and Cali enforcing the strictest diversion mandates.
| المعامل | القيمة |
|---|---|
| المنطقة | كولومبيا |
| رسوم المكب | 38 EUR/t |
| الإنتاجية السنوية | 40,000 t/yr |
| معدل التحويل عن المكب | 80% |
| النظام الموصى به | ARJES Impaktor 250 EVO II |
| نوع الناقل | DIESEL |
| معيار الانبعاثات | Tier 4_Final |
| مكون OPEX | التكلفة السنوية (EUR) |
|---|---|
| ديزل + AdBlue | €41,800(incl. AdBlue €1,505) |
| الصيانة | €24,000 |
| إجمالي OPEX السنوية | €67,305 |