Logo di AXE Machinery
Logo di AXE Machinery
MACHINERY//DISTRIBUTORE
ARJESIMPAKTOR
01Home
02MODELLI

// COMPATTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESANTE

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESANTE

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivio macchine

[ 00 ]Tutti i modelli//[ 99 ]Biblioteca PDF//
Attivo
03SOLUZIONI
04TECH
05CONFORMITÀ
Richiedi Dossier
US-TX // CONFORMITÀ🇺🇸 ACTIVE

Texas (USA)ARJES Impaktor 350 EVO II

▸ Mandato normativo

“Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).”

Atto originale:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
Fonte: Registro dei dati normativiRevisione richiesta
ARJES Impaktor 350 EVO II — recommended shredder for Texas (USA)
Potenza
175 kW
Trazione
diesel
Emissioni
Tier 4_Final
Prezzo di listino
€170K
Tassa di discarica
110EUR/t
Rifiuti C&D misti · 28 EUR/t frazione pulita
Risparmio annuo stimato
€3520K
€3,520,000 a 40,000 t/anno, deviazione 80%
OPEX annuo (TCO)
€66K
€66,269 · carburante + AdBlue + manutenzione · 2 000 h/anno
Energia / anno
€40,800
AdBlue / anno
€1,469
Manutenzione / anno
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calcolatore ROI // US-TX
40,000t/anno
5,000 t80,000 t

Tassa di discarica: 110 EUR/t · Deviazione: 80%

Risparmio annuo stimato
€3,520,000
110 EUR/t × 40,000 t × 80% deviazione
ARJES Impaktor 350 EVO II per Texas (USA)
Risparmio annuo stimato€3,520,000
Base legale

Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).

Atto originale:Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration ProgramTCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 350 EVO II
Meccanismi:accelerated depreciationcit deduction
✓ 100% AMMORT. ACCELERATO
Trazione:dieselEmissioni:Tier 4_FinalCarburante:24 L/h
← Torna all'Hub conformità
AXE MACHINERY
Distributore ufficiale ARJES — Rapporto di conformità
21 Sept 2026
Texas (USA)
ACTIVE

1. Base normativa

Atto originale: Texas Commission on Environmental Quality (TCEQ) Title 30 TAC Chapter 330 — Solid Waste Management Regulations + Concrete Recycler Registration Program
1. Base normativa: Texas TCEQ Title 30 Texas Administrative Code (TAC) Chapter 330 regulates solid waste management facilities, including specific provisions for C&D waste and concrete recyclers. Concrete recyclers must register with TCEQ under the Concrete & Building Material Recycling registration program and submit annual reports detailing tonnage received, processed, and diverted. Tier 4 Final emission standards apply to off-road diesel equipment per EPA coordination. Non-compliance penalties range from USD $500 to $25,000 per violation per day. The current mixed C&D gate fee is approximately USD $120/ST in major metropolitan areas (Houston, Dallas-Fort Worth, Austin, San Antonio).
Atto normativo: TCEQ Title 30 TAC Chapter 330 (Solid Waste Management) + Concrete Recycler Registration

2. Analisi impatto economico

ParametroValore
RegioneTexas (USA)
Tassa di discarica110 EUR/t
Portata annua40,000 t/yr
Tasso di deviazione80%
Sistema consigliatoARJES Impaktor 350 EVO II
Tipo di trazioneDIESEL
Standard emissioniTier 4_Final
Risparmio annuo stimato (tassa di discarica)
€3,520,000
a 40,000 t/anno, deviazione 80%
Componente OPEXCosto annuo (EUR)
Diesel + AdBlue€40,800(incl. AdBlue €1,469)
Manutenzione€24,000
Totale OPEX annuo€66,269
AXE Machinery — Partner distributivo ufficiale ARJES GmbHarjes-impaktor.rs

// CENTRO DI INFORMAZIONE

Ricerca & IngegneriaHub conformitàNOTIZIELogistica & Legacy

Soluzioni industriali per materiale // Hub operativi

Frantumazione di calcestruzzoRiciclaggio del legnoTrattamento di rottamiRifiuti solidi urbaniCostruzione e demolizioneRiciclaggio pneumatici OTRRiciclaggio VFUTutte le soluzioni →

// MATRICE DI CONFRONTO

INTERNO vs ESTERNOMOBILE vs STAZIONARIODIESEL vs ELETTRICOTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Tutti i confronti →

// CONTATTI

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
Logo di AXE Machinery
ARJESIMPAKTOR
Avviso legalePolitica sulla privacyCondizioni d'uso
© 2026 AXE Machinery. Tutti i diritti riservati