Logo di AXE Machinery
Logo di AXE Machinery
MACHINERY//DISTRIBUTORE
ARJESIMPAKTOR
01Home
02MODELLI

// COMPATTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESANTE

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESANTE

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivio macchine

[ 00 ]Tutti i modelli//[ 99 ]Biblioteca PDF//
Attivo
03SOLUZIONI
04TECH
05CONFORMITÀ
Richiedi Dossier
CH // CONFORMITÀ🇨🇭 ACTIVE

SuizaARJES Impaktor 1100

▸ Mandato normativo

“Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.”

Atto originale:Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
Fonte: Registro dei dati normativiRevisione richiesta
ARJES Impaktor 1100 — recommended shredder for Suiza
Potenza
585 kW
Trazione
diesel
Emissioni
Stage V
Prezzo di listino
€479K
Tassa di discarica
85EUR/t
Rifiuti C&D misti · 5 EUR/t frazione pulita
Risparmio annuo stimato
€2720K
€2,720,000 a 40,000 t/anno, deviazione 80%
OPEX annuo (TCO)
€114K
€113,510 · carburante + AdBlue + manutenzione · 2 000 h/anno
Energia / anno
€86,400
AdBlue / anno
€3,110
Manutenzione / anno
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calcolatore ROI // CH
40,000t/anno
5,000 t80,000 t

Tassa di discarica: 85 EUR/t · Deviazione: 80%

Risparmio annuo stimato
€2,720,000
85 EUR/t × 40,000 t × 80% deviazione
ARJES Impaktor 1100 per Suiza
Risparmio annuo stimato€2,720,000
Base legale

Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.

Atto originale:Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 1100
Meccanismi:vat exemptionaccelerated depreciationamortization shield
✓ VAT EXEMPT✓ 40% AMMORT. ACCELERATO
Trazione:dieselEmissioni:Stage VCarburante:24 L/h
← Torna all'Hub conformità
AXE MACHINERY
Distributore ufficiale ARJES — Rapporto di conformità
21 Sept 2026
Suiza
ACTIVE

1. Base normativa

Atto originale: Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)
1. Base normativa: Switzerland has maintained a 0% municipal waste landfilling rate since 2010, achieved through a landmark landfill ban on combustible waste enacted in 2000. Since January 2020, the landfill ban extends to all C&D waste. The VVEA (Waste Ordinance) mandates source separation and recycling of construction materials. New circular economy laws effective January 2025 further prioritize reuse and material recovery. The total cost of C&D waste disposal (incineration path) reaches approximately €85/t, making on-site processing highly economical. The Environmental Protection Act (USG) imposes criminal penalties for violations, with fines up to CHF 100,000 for legal entities.
Atto normativo: Umweltschutzgesetz (USG) & Verordnung über die Vermeidung und die Entsorgung von Abfällen (VVEA)

2. Analisi impatto economico

ParametroValore
RegioneSuiza
Tassa di discarica85 EUR/t
Portata annua40,000 t/yr
Tasso di deviazione80%
Sistema consigliatoARJES Impaktor 1100
Tipo di trazioneDIESEL
Standard emissioniStage V
Risparmio annuo stimato (tassa di discarica)
€2,720,000
a 40,000 t/anno, deviazione 80%
Componente OPEXCosto annuo (EUR)
Diesel + AdBlue€86,400(incl. AdBlue €3,110)
Manutenzione€24,000
Totale OPEX annuo€113,510
AXE Machinery — Partner distributivo ufficiale ARJES GmbHarjes-impaktor.rs

// CENTRO DI INFORMAZIONE

Ricerca & IngegneriaHub conformitàNOTIZIELogistica & Legacy

Soluzioni industriali per materiale // Hub operativi

Frantumazione di calcestruzzoRiciclaggio del legnoTrattamento di rottamiRifiuti solidi urbaniCostruzione e demolizioneRiciclaggio pneumatici OTRRiciclaggio VFUTutte le soluzioni →

// MATRICE DI CONFRONTO

INTERNO vs ESTERNOMOBILE vs STAZIONARIODIESEL vs ELETTRICOTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Tutti i confronti →

// CONTATTI

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
Logo di AXE Machinery
ARJESIMPAKTOR
Avviso legalePolitica sulla privacyCondizioni d'uso
© 2026 AXE Machinery. Tutti i diritti riservati