Logo di AXE Machinery
Logo di AXE Machinery
MACHINERY//DISTRIBUTORE
ARJESIMPAKTOR
01Home
02MODELLI

// COMPATTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESANTE

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESANTE

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivio macchine

[ 00 ]Tutti i modelli//[ 99 ]Biblioteca PDF//
Attivo
03SOLUZIONI
04TECH
05CONFORMITÀ
Richiedi Dossier
NO // CONFORMITÀ🇳🇴 ACTIVE

NoruegaARJES Impaktor 1100

▸ Mandato normativo

“Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.”

Atto originale:Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020
Fonte: Registro dei dati normativiRevisione richiesta
ARJES Impaktor 1100 — recommended shredder for Noruega
Potenza
585 kW
Trazione
diesel
Emissioni
Stage V
Prezzo di listino
€479K
Tassa di discarica
50EUR/t
Rifiuti C&D misti · 8 EUR/t frazione pulita
Risparmio annuo stimato
€1600K
€1,600,000 a 40,000 t/anno, deviazione 80%
OPEX annuo (TCO)
€116K
€115,997 · carburante + AdBlue + manutenzione · 2 000 h/anno
Energia / anno
€88,800
AdBlue / anno
€3,197
Manutenzione / anno
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calcolatore ROI // NO
40,000t/anno
5,000 t80,000 t

Tassa di discarica: 50 EUR/t · Deviazione: 80%

Risparmio annuo stimato
€1,600,000
50 EUR/t × 40,000 t × 80% deviazione
ARJES Impaktor 1100 per Noruega
Risparmio annuo stimato€1,600,000
Base legale

Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.

Atto originale:Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020
FISCAL_SHIELD // INCENTIVES· ARJES Impaktor 1100
Meccanismi:vat exemptionaccelerated depreciationamortization shield
✓ VAT EXEMPT✓ 40% AMMORT. ACCELERATO
Trazione:dieselEmissioni:Stage VCarburante:24 L/h
← Torna all'Hub conformità
AXE MACHINERY
Distributore ufficiale ARJES — Rapporto di conformità
21 Sept 2026
Noruega
ACTIVE

1. Base normativa

Atto originale: Forurensningsloven (Lov om vern mot forurensning og om avfall) & Byggteknisk forskrift (TEK17)
1. Base normativa: Norway's Pollution Control Act (Forurensningsloven) establishes a comprehensive framework for waste management, including a landfill ban on C&D waste since January 2020. The Building Technical Regulations (TEK17) mandate source separation of construction waste at demolition sites. Norway generated 1.8 million tonnes of C&D waste in 2025. The national waste incineration fee was set at NOK 485/t (~€42/t) from January 2024. The total gate fee for mixed C&D waste reaches approximately €50/t, incentivizing on-site processing. A new Construction Act was expected to enter into force in 2024, further tightening C&D waste requirements. Norway's 70% C&D waste recovery target is consistently exceeded.
Atto normativo: Forurensningsloven (Pollution Control Act) & Byggteknisk forskrift (TEK17) — C&D waste landfill ban since 2020

2. Analisi impatto economico

ParametroValore
RegioneNoruega
Tassa di discarica50 EUR/t
Portata annua40,000 t/yr
Tasso di deviazione80%
Sistema consigliatoARJES Impaktor 1100
Tipo di trazioneDIESEL
Standard emissioniStage V
Risparmio annuo stimato (tassa di discarica)
€1,600,000
a 40,000 t/anno, deviazione 80%
Componente OPEXCosto annuo (EUR)
Diesel + AdBlue€88,800(incl. AdBlue €3,197)
Manutenzione€24,000
Totale OPEX annuo€115,997
AXE Machinery — Partner distributivo ufficiale ARJES GmbHarjes-impaktor.rs

// CENTRO DI INFORMAZIONE

Ricerca & IngegneriaHub conformitàNOTIZIELogistica & Legacy

Soluzioni industriali per materiale // Hub operativi

Frantumazione di calcestruzzoRiciclaggio del legnoTrattamento di rottamiRifiuti solidi urbaniCostruzione e demolizioneRiciclaggio pneumatici OTRRiciclaggio VFUTutte le soluzioni →

// MATRICE DI CONFRONTO

INTERNO vs ESTERNOMOBILE vs STAZIONARIODIESEL vs ELETTRICOTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Tutti i confronti →

// CONTATTI

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
Logo di AXE Machinery
ARJESIMPAKTOR
Avviso legalePolitica sulla privacyCondizioni d'uso
© 2026 AXE Machinery. Tutti i diritti riservati