Logo di AXE Machinery
Logo di AXE Machinery
MACHINERY//DISTRIBUTORE
ARJESIMPAKTOR
01Home
02MODELLI

// COMPATTO

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// STANDARD

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// PESANTE

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// SUPER PESANTE

[ 01 ]1250 D//[ 02 ]1250 E//

// Archivio macchine

[ 00 ]Tutti i modelli//[ 99 ]Biblioteca PDF//
Attivo
03SOLUZIONI
04TECH
05CONFORMITÀ
Richiedi Dossier
BR // CONFORMITÀ🇧🇷 ACTIVE

BrasileIMPAKTOR 350 EVO II

▸ Mandato normativo

“Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.”

Atto originale:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
Fonte: Registro dei dati normativiRevisione richiesta
IMPAKTOR 350 EVO II — recommended shredder for Brasile
Potenza
175 kW
Trazione
diesel
Emissioni
Tier 4_Final
Prezzo di listino
€170K
Tassa di discarica
55EUR/t
Rifiuti C&D misti · 15 EUR/t frazione pulita
Risparmio annuo stimato
€1760K
€1,760,000 a 40,000 t/anno, deviazione 80%
OPEX annuo (TCO)
€72K
€71,863 · carburante + AdBlue + manutenzione · 2 000 h/anno
Energia / anno
€46,200
AdBlue / anno
€1,663
Manutenzione / anno
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

Calcolatore ROI // BR
40,000t/anno
5,000 t80,000 t

Tassa di discarica: 55 EUR/t · Deviazione: 80%

Risparmio annuo stimato
€1,760,000
55 EUR/t × 40,000 t × 80% deviazione
IMPAKTOR 350 EVO II per Brasile
Risparmio annuo stimato€1,760,000
Base legale

Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.

Atto originale:Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002
FISCAL_SHIELD // INCENTIVES· IMPAKTOR 350 EVO II
Meccanismi:accelerated depreciationcit deduction
✓ 20% AMMORT. ACCELERATO
Trazione:dieselEmissioni:Tier 4_FinalCarburante:22 L/h
← Torna all'Hub conformità
AXE MACHINERY
Distributore ufficiale ARJES — Rapporto di conformità
21 Sept 2026
Brasile
ACTIVE

1. Base normativa

Atto originale: Lei 12.305/2010 (Política Nacional de Resíduos Sólidos — PNRS) + Resolução CONAMA 307/2002
1. Base normativa: Brazil's PNRS (Law 12.305/2010) establishes the National Solid Waste Policy, mandating that construction and demolition projects prepare waste management plans (PGRS — Plano de Gerenciamento de Resíduos Sólidos) for generators handling more than 20 t/day. CONAMA Resolution 307/2002 specifically regulates C&D waste, classifying it into four classes (A–D) and requiring segregation, reuse, and recycling of Class A recyclable fractions (concrete, ceramics, masonry). Non-compliance penalties range from BRL $500 to BRL $50 million per infraction under IBAMA enforcement. The current mixed C&D gate fee is approximately USD $55/t at licensed landfills.
Atto normativo: Lei 12.305/2010 (PNRS — Política Nacional de Resíduos Sólidos) + CONAMA Resolução 307/2002

2. Analisi impatto economico

ParametroValore
RegioneBrasile
Tassa di discarica55 EUR/t
Portata annua40,000 t/yr
Tasso di deviazione80%
Sistema consigliatoIMPAKTOR 350 EVO II
Tipo di trazioneDIESEL
Standard emissioniTier 4_Final
Risparmio annuo stimato (tassa di discarica)
€1,760,000
a 40,000 t/anno, deviazione 80%
Componente OPEXCosto annuo (EUR)
Diesel + AdBlue€46,200(incl. AdBlue €1,663)
Manutenzione€24,000
Totale OPEX annuo€71,863
AXE Machinery — Partner distributivo ufficiale ARJES GmbHarjes-impaktor.rs

// CENTRO DI INFORMAZIONE

Ricerca & IngegneriaHub conformitàNOTIZIELogistica & Legacy

Soluzioni industriali per materiale // Hub operativi

Frantumazione di calcestruzzoRiciclaggio del legnoTrattamento di rottamiRifiuti solidi urbaniCostruzione e demolizioneRiciclaggio pneumatici OTRRiciclaggio VFUTutte le soluzioni →

// MATRICE DI CONFRONTO

INTERNO vs ESTERNOMOBILE vs STAZIONARIODIESEL vs ELETTRICOTEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000Tutti i confronti →

// CONTATTI

+381644422555
info@arjes-impaktor.rs
BC Usce, Tower 1Bulevar Mihajla Pupina 611070 Belgrade, SerbiaUTC+144.8125 N, 20.4612 E
Logo di AXE Machinery
ARJESIMPAKTOR
Avviso legalePolitica sulla privacyCondizioni d'uso
© 2026 AXE Machinery. Tutti i diritti riservati