AXE 机械 Logo
AXE 机械 Logo
机械//经销商
ARJESIMPAKTOR
01首页
02产品

// 紧凑型

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// 标准型

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// 重型

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// 超重型

[ 01 ]1250 D//[ 02 ]1250 E//

// 机械档案

[ 00 ]全部机型//[ 99 ]PDF 库//
激活
03解决方案
04技术
05合规
请求
US-NY // 合规🇺🇸 ACTIVE

纽约(美国)IMPAKTOR 1100

监管指令

“New York's DEC Part 360 (Title 6 NYCRR Part 360) regulates solid waste management facilities, including specific permits for C&D processing facilities (Subpart 360-5) requiring source separation of recyclable C&D fractions. NYC Local Law 97 (Climate Mobilization Act, effective 2024) imposes building emissions limits that drive urban demolition and retrofit projects, mandating C&D waste diversion from landfill. Tier 4 Final emission standards apply to off-road diesel equipment under DEC coordination with EPA. Non-compliance penalties range from USD $1,000 to $50,000 per violation per day. New York gate fees for mixed C&D waste are the highest in the USA at approximately USD $210/ST in NYC metro.”

原始法案:New York State DEC Part 360 (Solid Waste Management Facilities) + NYC Local Law 97 (Climate Mobilization Act)NYC DEC Part 360 (Solid Waste Management Facilities) + Local Law 97 (Building Emissions)
来源: 监管数据图谱需要复核
IMPAKTOR 1100 — recommended shredder for 纽约(美国)
功率
585 kW
驱动方式
diesel
排放
Tier 4_Final
标价
€479K
垃圾填埋费
192EUR/t
混合 C&D 废料 · 48 EUR/t 洁净分率
年度节省
€6144K
€6,144,000,处理量 40,000 t/年,分流率 80%
年度运营支出
€76K
€75,579 · 能源 + AdBlue + 维护 · 2,000 h/年
能源 / 年
€49,500
AdBlue / 年
€2,079
维护 / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

US-NY
40,000t/yr
5,000 吨80,000 吨

填埋费预设: 192 EUR/t · 分流率: 80%

年度节省
€6,144,000
192 EUR/t × 40,000 t × 80% 分流率
纽约(美国) 适用的 IMPAKTOR 1100
粘性节省€6,144,000
SEC_02_LEGAL_BASIS

New York's DEC Part 360 (Title 6 NYCRR Part 360) regulates solid waste management facilities, including specific permits for C&D processing facilities (Subpart 360-5) requiring source separation of recyclable C&D fractions. NYC Local Law 97 (Climate Mobilization Act, effective 2024) imposes building emissions limits that drive urban demolition and retrofit projects, mandating C&D waste diversion from landfill. Tier 4 Final emission standards apply to off-road diesel equipment under DEC coordination with EPA. Non-compliance penalties range from USD $1,000 to $50,000 per violation per day. New York gate fees for mixed C&D waste are the highest in the USA at approximately USD $210/ST in NYC metro.

原始法案:New York State DEC Part 360 (Solid Waste Management Facilities) + NYC Local Law 97 (Climate Mobilization Act)NYC DEC Part 360 (Solid Waste Management Facilities) + Local Law 97 (Building Emissions)
FISCAL_SHIELD // INCENTIVES· IMPAKTOR 1100
机制:accelerated depreciationcit deduction
✓ 增值税豁免✓ 100% 加速折旧
驱动:diesel排放:Tier 4_Final燃油:22.5 L/h
返回合规中心
AXE MACHINERY
合规报告
07 Sept 2026
纽约(美国)
ACTIVE

1. 监管依据

原始法案: New York State DEC Part 360 (Solid Waste Management Facilities) + NYC Local Law 97 (Climate Mobilization Act)
1. 监管依据: New York's DEC Part 360 (Title 6 NYCRR Part 360) regulates solid waste management facilities, including specific permits for C&D processing facilities (Subpart 360-5) requiring source separation of recyclable C&D fractions. NYC Local Law 97 (Climate Mobilization Act, effective 2024) imposes building emissions limits that drive urban demolition and retrofit projects, mandating C&D waste diversion from landfill. Tier 4 Final emission standards apply to off-road diesel equipment under DEC coordination with EPA. Non-compliance penalties range from USD $1,000 to $50,000 per violation per day. New York gate fees for mixed C&D waste are the highest in the USA at approximately USD $210/ST in NYC metro.
监管法案: NYC DEC Part 360 (Solid Waste Management Facilities) + Local Law 97 (Building Emissions)

2. 经济影响分析

参数数值
区域纽约(美国)
垃圾填埋费192 EUR/t
处理量40,000 t/yr
分流率80%
推荐系统IMPAKTOR 1100
驱动类型DIESEL
排放标准Tier 4_Final
节省标签
€6,144,000
处理量 40,000 t/年,填埋分流率 80%
运营支出组件运营支出成本
柴油€49,500(incl. AdBlue €2,079)
维护€24,000
总计€75,579
AXE Machinery d.o.o. — 合规报告arjes-impaktor.rs

// 信息中心

研发与工程合规中心新闻物流与遗产设备

按物料分类的工业解决方案 // 运营中心

混凝土破碎木材回收废钢处理城市固体废物建筑拆除OTR 轮胎回收ELV 回收所有解决方案 →

// 对比矩阵

自营 vs 外包移动式 vs 固定式柴油 vs 电动TEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000所有对比 →

// 联系我们

+381644422555
info@arjes-impaktor.rs
BC Usce,1 号塔Bulevar Mihajla Pupina 611070 贝尔格莱德,塞尔维亚UTC+144.8125 N, 20.4612 E
AXE 机械 Logo
ARJESIMPAKTOR
法律隐私政策使用条款
© 2026 AXE Machinery. 保留所有权利