AXE 机械 Logo
AXE 机械 Logo
机械//经销商
ARJESIMPAKTOR
01首页
02产品

// 紧凑型

[ 01 ]250 EVO I//[ 02 ]250 E EVO I//[ 03 ]250 EVO II//[ 04 ]250 E EVO II//

// 标准型

[ 01 ]350 EVO I//[ 02 ]350 E EVO I//[ 03 ]350 EVO II//[ 04 ]350 E EVO II//

// 重型

[ 01 ]850//[ 02 ]1000//[ 03 ]1100//

// 超重型

[ 01 ]1250 D//[ 02 ]1250 E//

// 机械档案

[ 00 ]全部机型//[ 99 ]PDF 库//
激活
03解决方案
04技术
05合规
请求
US // 合规🇺🇸 ACTIVE

美国(内华达/亚利桑那)IMPAKTOR 250 EVO II

监管指令

“US federal regulation EPA 40 CFR Part 258 establishes the national minimum criteria for municipal solid waste landfills (MSWLFs). Federal enforcement is delegated to states with EPA oversight; states (CA, NY, TX, FL, etc.) implement stricter state-level rules. Federal penalties reach $70,117 per day per violation under 40 CFR §19.4 inflation adjustment (2024). Gate fees are state-level and vary widely (CA $185/ST, NY $210/ST).”

原始法案:EPA 40 CFR Part 258 — Criteria for Classification of Solid Waste Disposal Facilities and PracticesEPA 40 CFR Part 258 (Criteria for Classification of Solid Waste Disposal Facilities)
来源: 监管数据图谱需要复核
IMPAKTOR 250 EVO II — recommended shredder for 美国(内华达/亚利桑那)
功率
129 kW
驱动方式
diesel
排放
Tier 4_Final
标价
€163K
垃圾填埋费
0EUR/t
混合 C&D 废料 · 0 EUR/t 洁净分率
年度节省
€0K
€0,处理量 40,000 t/年,分流率 80%
年度运营支出
€74K
€74,039 · 能源 + AdBlue + 维护 · 2,000 h/年
能源 / 年
€48,300
AdBlue / 年
€1,739
维护 / yr
€24,000

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.

40,000t/yr
5,000 吨80,000 吨

填埋费预设: 0 EUR/t · 分流率: 80%

年度节省
€0
0 EUR/t × 40,000 t × 80% 分流率
美国(内华达/亚利桑那) 适用的 IMPAKTOR 250 EVO II
粘性节省€0
SEC_02_LEGAL_BASIS

US federal regulation EPA 40 CFR Part 258 establishes the national minimum criteria for municipal solid waste landfills (MSWLFs). Federal enforcement is delegated to states with EPA oversight; states (CA, NY, TX, FL, etc.) implement stricter state-level rules. Federal penalties reach $70,117 per day per violation under 40 CFR §19.4 inflation adjustment (2024). Gate fees are state-level and vary widely (CA $185/ST, NY $210/ST).

原始法案:EPA 40 CFR Part 258 — Criteria for Classification of Solid Waste Disposal Facilities and PracticesEPA 40 CFR Part 258 (Criteria for Classification of Solid Waste Disposal Facilities)
FISCAL_SHIELD // INCENTIVES· IMPAKTOR 250 EVO II
机制:accelerated depreciation
✓ 增值税豁免✓ 100% 加速折旧
驱动:diesel排放:Tier 4_Final燃油:23 L/h
返回合规中心
AXE MACHINERY
合规报告
07 Sept 2026
美国(内华达/亚利桑那)
PENDING

1. 监管依据

原始法案: EPA 40 CFR Part 258 — Criteria for Classification of Solid Waste Disposal Facilities and Practices
1. 监管依据: US federal regulation EPA 40 CFR Part 258 establishes the national minimum criteria for municipal solid waste landfills (MSWLFs). Federal enforcement is delegated to states with EPA oversight; states (CA, NY, TX, FL, etc.) implement stricter state-level rules. Federal penalties reach $70,117 per day per violation under 40 CFR §19.4 inflation adjustment (2024). Gate fees are state-level and vary widely (CA $185/ST, NY $210/ST).
监管法案: EPA 40 CFR Part 258 (Criteria for Classification of Solid Waste Disposal Facilities)

2. 经济影响分析

参数数值
区域美国(内华达/亚利桑那)
垃圾填埋费0 EUR/t
处理量40,000 t/yr
分流率80%
推荐系统IMPAKTOR 250 EVO II
驱动类型DIESEL
排放标准Tier 4_Final
节省标签
€0
处理量 40,000 t/年,填埋分流率 80%
运营支出组件运营支出成本
柴油€48,300(incl. AdBlue €1,739)
维护€24,000
总计€74,039
AXE Machinery d.o.o. — 合规报告arjes-impaktor.rs

// 信息中心

研发与工程合规中心新闻物流与遗产设备

按物料分类的工业解决方案 // 运营中心

混凝土破碎木材回收废钢处理城市固体废物建筑拆除OTR 轮胎回收ELV 回收所有解决方案 →

// 对比矩阵

自营 vs 外包移动式 vs 固定式柴油 vs 电动TEREX TTS 620 vs IMPAKTORTANA SHARK 4400 vs IMPAKTOR 1250 ELINDNER UPTREK 7000所有对比 →

// 联系我们

+381644422555
info@arjes-impaktor.rs
BC Usce,1 号塔Bulevar Mihajla Pupina 611070 贝尔格莱德,塞尔维亚UTC+144.8125 N, 20.4612 E
AXE 机械 Logo
ARJESIMPAKTOR
法律隐私政策使用条款
© 2026 AXE Machinery. 保留所有权利