监管指令“Vision 2030 NTP directly bans unsorted reinforced concrete disposal at Riyadh and Jeddah landfills. EUR 64/t gate fee creates the strongest MENA penalty arbitrage. OTR tire processing capability required for mining sector integration.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
填埋费预设: 64 EUR/t · 分流率: 80%
Vision 2030 NTP directly bans unsorted reinforced concrete disposal at Riyadh and Jeddah landfills. EUR 64/t gate fee creates the strongest MENA penalty arbitrage. OTR tire processing capability required for mining sector integration.
| 参数 | 数值 |
|---|---|
| 区域 | 沙特阿拉伯 |
| 垃圾填埋费 | 64 EUR/t |
| 处理量 | 40,000 t/yr |
| 分流率 | 80% |
| 推荐系统 | IMPAKTOR 1100 |
| 驱动类型 | DIESEL |
| 排放标准 | Tier 3 |
| 运营支出组件 | 运营支出成本 |
|---|---|
| 柴油 | €27,300(incl. AdBlue €983) |
| 维护 | €24,000 |
| 总计 | €52,283 |