监管指令“Waste Act (RT I 2024, 21, 163) transposes EU ELV Directive with mandatory 5-stream end-of-life vehicle separation. CIT 20% only upon profit distribution, VAT 22%. High EUR 38/t gate fee.”

Regional Landfill Gate Fees normalized to $/ST for US/Global baseline comparisons. Local operating calculations utilize local EUR/t rate structures.
填埋费预设: 38 EUR/t · 分流率: 80%
Waste Act (RT I 2024, 21, 163) transposes EU ELV Directive with mandatory 5-stream end-of-life vehicle separation. CIT 20% only upon profit distribution, VAT 22%. High EUR 38/t gate fee.
| 参数 | 数值 |
|---|---|
| 区域 | 爱沙尼亚 |
| 垃圾填埋费 | 38 EUR/t |
| 处理量 | 40,000 t/yr |
| 分流率 | 80% |
| 推荐系统 | ARJES Impaktor 250 e-EVO II |
| 驱动类型 | ELECTRIC |
| 排放标准 | Zero Emission |
| 运营支出组件 | 运营支出成本 |
|---|---|
| 电力 | €27,962 |
| 维护 | €14,000 |
| 总计 | €41,962 |
| 对比柴油基线的节省(5 年) | €230,936 |